Karcher 600 CD manual 3.3Connecting the Equipment, Operation Of The System

Models: 600 CD

1 93
Download 93 pages 15.74 Kb
Page 26
Image 26
3.3Connecting the Equipment

OPERATION OF THE SYSTEM

WTC 600 LP / MP

3.3Connecting the Equipment

3.3.1Connections, Valves and Indicators

Depending on the local untreated water supply, the WTC 600 LP/MP is connected directly to the off-site supply or supplemented through a WTC 600 PI pressure-increase module.

The following constructional measures must be observed:

-The off-site untreated water supply must be equipped with a shut-off device (supplied by user / customer).

-All pipes / lines (untreated water, backwashing, concentrate and drinking water) to be installed without mechanical tension.

-Drinking water line to be installed with free run-out and no further shut-off devices.

-Backwashing line to be installed with steady drop (under no circumstances inclined upward).

For easy and secure operation and main- tenance of the system, minimum clearances from the walls are to be observed:

Page

 

Minimum clearances [cm]

 

 

 

 

 

 

 

A

 

50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

70

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 12

Minimum clearances

Figure 8 Minimum clearances WTC 600 LP/MP

2

1

 

 

 

3

 

 

 

 

Figure 9 Water connections, WTC 600 PI

Installation space (incl. working space for maintenance and operation, not including piping): WTC 600 LP and MP: width x depth: 1300 x 1900mm

WTC 600 LP-A, LP-AM, MP-A, MP-AM: width x depth: 1700 x 1900 mm

WTC 600 CD: width x depth: 500 x 1100 mm

WTC 600 PI: width x depth: 600 x 200 mm

26

Service Handbook 08.2004

Page 26
Image 26
Karcher 600 CD manual 3.3Connecting the Equipment, Operation Of The System, 3.3.1Connections, Valves and Indicators