INSTALLATION | ||
|
|
|
System (DeviceNet PLC Controller)
DeviceNet | Arclink Input |
R | C | 1 |
| ||
A |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
|
|
| E |
|
| R |
| C |
|
|
|
|
|
|
| F | A | C | |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
| C | A |
|
|
|
|
|
|
|
|
| E | R |
|
|
R | 2 |
|
|
|
|
|
|
|
| T |
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| I |
|
|
|
| ||
A |
|
|
|
|
|
|
|
| M | N |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
| T | E |
|
|
|
|
|
| |
|
|
|
|
|
| S |
|
|
|
|
|
|
| ||
|
|
|
|
| Y |
|
|
|
|
|
|
|
| ||
|
|
| S |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Master Input (S12) Conects to System Interface | Wire Feeder (14 Pin) | Arclink (5Pin) Device Net (5 Pin) |
| 3 |
| C |
A | R |
|
Work Studs | * Electrode Cables | Electrode Sense Lead (67) | Leads (21) | |
|
|
|
| Work Sense |
Connection Diagram- Typical Triple Arc
Arclink Control Cable
PLC Controller
User Interface
| 2 |
| C |
A | R |
|
| 1 |
| C |
A | R |
|
| Wire Reel and Mountings |
DeviceNet Cable Network | Electrode Studs |
3
C
R
A
2
C
R
A
1
C
R
A
Work Cables | Head | K231- XXX |
* |
|
|
21 Lead | 14 PinConnector | Work Piece recommended cable size. |
67 Lead |
| Guidelines" for |
|
| * Refer to "Output Cable |
POWER WAVE® AC/DC 1000