INSTALLATION | ||
|
|
|
| STEP BY STEP INSTALLATION CHECKLIST |
|
TANDEM ARC SYSTEM CHECKLIST –
(as shown in the Connection Diagram "Typical Tandem Arc System”)
Place Power Waves in suitable operating location.
Mount PF10A Controllers.
Install PF10S Wire Drives and other accessories in their operating location.
Mount Power Wave System Interface.
Connect
Connect
Connect
Connect
Configure / Install sense leads.
Connect / Install welding cables per recommended "Output Cable Guidelines."
Open all Power Wave front panels and configure DIP switch settings per "Internal Controls" section.
Connect input power to Power Waves per recommended guidelines.
Turn on Power Waves, and verify all system Status Lights are solid green.
NOTES:
(1)ArcLink and Wire Feeder control cable connections are only required at the Master power source of each arc grouping. For additional information see the "Extra Capacity Parallel Connection Checklist."
(2)The "ARC" (formerly "PHASE") connections from the System Interface are only required for the Master power source of each arc grouping. For additional information see the "Extra Capacity Parallel Connection Checklist."
POWER WAVE® AC/DC 1000