1. Installation

3.Insert and tighten the screws in the top screw positions, then tighten the bottom screws.

RTN

-

 

48VDC

B3.5 A 60

A

POWER

A

B

 

ALARM

 

CONSOLE

 

 

SUT KNI ATS LPU

BITS

 

MGMT

MRL TSE A T

4202

TX

 

E1

MODULE

75W

RX

 

 

100/120W

 

 

 

1

4

8

 

 

13

16

20

 

 

12

24

DSL PORTS 1-24 POTS 1-24

23-inch (584 mm) Nortel

Rack Mount

4. Do not plug in the unit. Proceed to Installing the Uplink Module on page 1-13.

4200-A2-GN20-10

October 2002

1-9

Page 19
Image 19
Paradyne GranDSLAM 4200 manual Inch 584 mm Nortel Rack Mount