2. Cabling
Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke
The 4203 T1/E1 IMA Uplink is shipped with a ferrite choke that must be installed on the DSL cable(s). One choke can accommodate
Procedure
To install the ferrite choke onto the DSL cable(s):
1.Open the ferrite choke and place it around the cable(s) as close to the cable connector on the uplink module as possible.
2.Close the two halves around the cable and snap the choke shut, pressing down on the plastic latch to secure it.
3.To prevent the ferrite choke from slipping down the cable, install a tie wrap behind the ferrite choke as shown.
Tie
Wrap
Plastic
Latch
October 2002 |