2. Cabling

Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke

The 4203 T1/E1 IMA Uplink is shipped with a ferrite choke that must be installed on the DSL cable(s). One choke can accommodate 1–8 cables.

Procedure

To install the ferrite choke onto the DSL cable(s):

1.Open the ferrite choke and place it around the cable(s) as close to the cable connector on the uplink module as possible.

2.Close the two halves around the cable and snap the choke shut, pressing down on the plastic latch to secure it.

3.To prevent the ferrite choke from slipping down the cable, install a tie wrap behind the ferrite choke as shown.

Tie

Wrap

Plastic

Latch

02-17334

2-8

October 2002

4200-A2-GN20-10

Page 32
Image 32
Paradyne GranDSLAM 4200 manual Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke