1. Installation

Installing the Uplink Module

Each GranDSLAM 4200 requires an uplink module for connection to the ATM network. If your uplink module was shipped separately from the GranDSLAM 4200, install the uplink module before you connect the unit to a power source. If your GranDSLAM 4200 arrived with an uplink module already installed, proceed to Chapter 2, Cabling.

NOTE:

The uplink modules are hot swappable. If you install an uplink module after the unit has already been powered-on, reset the unit before attempting to operate it.

HANDLING PRECAUTIONS FOR

!STATIC-SENSITIVE DEVICES

This product is designed to protect sensitive components from damage due to electrostatic discharge (ESD) during normal operation. When performing installation procedures, however, take proper static control precautions to prevent damage to equipment. If you are not sure of the proper static control precautions, contact your nearest sales or service representative.

Procedure

To install the uplink module:

1.Remove the two captive screws holding the blank filler panel on the GranDSLAM 4200.

RTN -

 

 

48VDC

3.5 A

 

B

60

 

 

A

 

 

POWER

A

B

 

ALARM

CONSOLE

STATUS UPLINK

BITS

1

4

 

 

8

12

13

16

 

 

20

24

02-17264

2. Store the blank filler panel and screws for possible future use.

4200-A2-GN20-10

October 2002

1-13

Page 23
Image 23
Paradyne GranDSLAM 4200 manual Installing the Uplink Module