Installation and commissioning

8.04 Connecttheplug-typeconnectionsandearthcableoftheQuick-flangemotor.

7

6

A

8

B

1

2

7

3

5

4

Fig. 8 - 06

Connect all the plugs1-5to the control box as labelled.

Screw the earth cable from the sewing head and from main switch6 to earth pointA.

Connect earth pointA and earth pointB with earth cable7.

Screw the earth cable8 from the motor to earth pointB.

8 - 4