Installation and commissioning
8.05 Commissioning
●Examine the machine, in particular the electric cables and pneumatic connection tubes for any damage.
●Clean the machine thoroughly and then oil it.
●Have qualified personnel check whether the machine can be operated with the available voltage and whether it is connected properly in the terminal box. If there are any irregularities do not operate the machine under any circumstances.
●When the machine is running, the balance wheel must turn towards the operator, see
Chapter8.07Basicpositionofthemachinedriveunit.
●Connect the machine to the compressed air system. The pressure gauge should show a pressure of 6 bar. If necessary, adjust the value, seeChapter11.05Checking/adjusting theairpressure.
1
4
4
2
5
3
Fig. 8 - 07 | Fig. 8 - 08 |
●Before commissioning the machine remove plug1 from its hole and fill in oil up to marking2, seeChapter11.02Oilingthehook.
Plug1 serves as a safety device for transportation and should not be used during sewing operations.
●Before commissioning the machine remove screw3 and fill in oil up to the marking (inspection glass on the front side of the machine), seeChapter11.03Oilingthezigzag drive.
8.06 Switchingthemachineon/off
●Switch the machine on, seeChapter7.01Mainswitch.
●Carry out a test run.