Adjustment
12.05.25 Needle thread tension release (on machines withoutRequirement
When the hand lever is raised, the tensions disks should be at least0.5mm apart.
1
2
Fig. 12 - 26
4
3
0.5 mm
3
● Loosen screw1 and press linkage rod 2 down as far as possible. ● Raise the presser foot.
●Adjust trip3 (screw4) in accordance with therequirement.
12 - 27