1.3.2Assembling Multi Fryer Systems
If you purchased a
a.Unpack the units and move them close together. Remove the front panels and both heat shields from the fryers.
b.There are five joining strips to be attached to the units to make them into one system. These strips are attached in the rear, front, upper front, and the forward and rear caster mount. Use the screws supplied with your system to attach the strips. Secure them tightly to each unit.
c.Replace the heat shield and front panels to complete the system assembly.
1.4INSTALLATION
Although it is possible for you to install and set up your new fryer, it is STRONGLY recommended that you have it done by qualified professionals. The professionals that install your new fryer will know the local building codes and ensure that your installation is safe.
WARNING
The fryer must be properly restrained to prevent movement or tipping. This restraint must prevent the fryer from movements that would splash hot liquids on personnel. This restraint may be any means (alcove installation, adequate ties, or battery installation).
1.4.1Installation Clearances
The fryer needs clearance around it for proper operation. Adequate clearances allow for servicing and proper burner operation. The clearances shown below are for cooker installation in combustible and
| Combustible | |
| Construction | Construction |
Back | 6" | 0" |
Sides | 6" | 0" |
Floor - Combustible | 6" | 6" |
1.4.2Gas Connection
Your fryer will give you peak performance when the gas supply line is of sufficient size to provide the correct gas flow. The gas line must be installed to meet the local building codes or National Fuel Gas