Starter Kit Instruction Manual

Maintenance

46

8.4.2TCU151 temperature controller calibration

!WARNING ! Keep in mind that during the calibration procedure, the instrument is powered on.

Before beginning

[1]Power off the instrument.

[2]Open the TCU151 top cover (1) to access the TCU151 main board (2).

Material needed

Voltmeter HP3458A or equivalent.

Voltage source Keithley SMU237 or equiva- lent.

Precision resistor 100 Ohm 1% or better.

Cable: LEMO 6 poles female 6 bananas fe-

male (LEMO connector: LFGG.1B.306.CLAD72Z, LEMO handler GMA.1B.065.DG).

1

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

Alar

 

 

 

 

 

 

 

 

e

 

 

m

 

 

 

 

 

 

 

 

mp

 

 

 

Reset

 

Se

 

Real￿

 

 

er151

 

 

 

Exter

ttin

 

C

Re

 

e

Con

 

 

 

 

g￿C

 

alI

 

 

 

 

 

nal

 

 

 

 

 

 

 

tro

 

 

 

 

 

 

 

Se

 

 

 

lle

 

 

 

 

 

 

 

 

 

 

r

 

 

 

 

 

 

 

ttin

 

 

 

 

 

Int

 

 

 

 

 

g+I

 

 

 

 

 

 

 

 

 

 

Se

 

 

 

 

 

er

 

 

 

 

 

 

 

 

 

 

nal

 

 

 

 

 

ttin

 

 

 

 

 

 

 

 

 

 

 

g−I

 

 

 

 

 

 

 

 

 

 

 

+

 

 

 

 

 

 

 

 

 

 

 

 

 

Procedure

+5V/-5V power supply check.

CAUTION ! Do not connect the signal IN-34 V DC (connector J1 (3)).

[1]Check the input impedance between +5V/-

5V and GND

note: The values should be:

TP1 (4) - GND (5): > 5 kΩ.

TP2 (6) - GND (5): < 4 kΩ.

[2]Power on the instrument.

[3]Check the +5V/-5Vpower supply volt- age.

Note: The values should be:

TP1 (4) - GND (5): 4.95 to 5.2 V.

TP2 (6) - GND (5): 4.95 to 5.2 V.

Fig.37: Removing the top cover

3

4

5

6

Fig.38: TCU151 main board

Page 47
Image 47
Quantum Instruments Cascade Laser Starter Kit manual 2 TCU151 temperature controller calibration