3 INSTALLATION

 

 

SITRANS FX300

 

 

 

 

3.6 Installation

3.6.1 General installation notes

CAUTION!

Installation, assembly, start-up and maintenance may only be performed by appropriately trained personnel. The regional occupational health and safety directives must always be observed.

The following procedures have to be carried out before installing the device:

Remove all transportation safety devices and protective coverings from the device.

Ensure that the gaskets have the same diameter as the pipelines.

Note the correct flow direction for the device. This is indicated by an arrow on the housing of the measuring sensor.

On metering points with varying thermal loads, the flowmeters have to be mounted with stress bolts (DIN 2510).

Stress bolts or bolts and nuts are not included in the scope of delivery.

Ensure that the measuring flange is concentrically fitted.

Note the exact installation length of the measuring device when preparing the metering point.

Figure 3-10: Preparing the metering point

1Installation length of measuring device + thickness of gaskets.

CAUTION!

The internal diameter of the pipelines, the measuring sensor and the gaskets must match. The gaskets may not protrude into the flow.

Figure 3-11: Internal diameter

1Internal diameter connection pipe

2Internal diameter flange and gasket

3Internal diameter measuring sensor

28

www.siemens.com/flow

06/2009 - SFIDK.PS.050.F2.02 A5E02100423

Page 28
Image 28
Siemens FX300 manual Installation, General installation notes