Commissioning

6

Chapter Overview

Section

Description

Page

 

 

 

6.1

Recommended Procedure for First Startup

6-2

 

 

 

6.2

Checks Prior to Switching On for the First Time

6-3

 

 

 

6.3

Connecting a Programming Device (PG) to an S7-400

6-5

 

 

 

6.4

Switching On an S7-400 for the First Time

6-6

 

 

 

6.5

Resetting the CPU with the Mode Selector Switch

6-7

 

 

 

6.6

Cold, Warm, and Hot Restarts with the Mode Selector Switch

6-10

 

 

 

6.7

Inserting a Memory Card

6-11

 

 

 

6.8

Inserting a Backup Battery (Option)

6-13

 

 

 

6.9

Starting Up a PROFIBUS-DP Subnet

6-17

 

 

 

6.10

Installing Interface Submodules

6--18

 

(CPU 414-3, 414-3, 416-3, 417-4 and 417-4H)

 

 

 

 

Automation System S7-400

Hardware and Installation

6-1

A5E00850741-01

 

Page 129
Image 129
Siemens S7-400 installation manual Commissioning