According to the backup concept, Table 6-2 shows how you must set the battery monitoring switch on the different power supply modules.

Table 6-2 Setting the Battery Monitoring Switch

If You ...

...Then

 

 

do not use battery monitoring,

set the BATT INDIC switch to OFF.

 

 

use battery monitoring with a single-width

set the BATT INDIC switch to BATT.

power supply module,

 

 

 

want to monitor a backup battery with a

set the BATT INDIC switch to 1BATT.

double or triple-width power supply module,

 

 

 

want to monitor two backup batteries with a

set the BATT INDIC switch to 2BATT.

double or triple-width power supply module,

 

 

 

6.3Connecting a Programming Device (PG) to an S7-400

Connecting a Programming Device (PG) to an S7-400

You must connect the programming device via a connecting cable to the MPI of the CPU. This allows access via the communication bus to all CPUs and programmable modules.

S7-400

PG cable

Programming device

Figure 6-1 Connecting PG to an S7-400

Automation System S7-400