Installing the S7-400

2

Chapter Overview

Section

Description

Page

 

 

 

2.1

S7-400 Installation

2-2

 

 

 

2.2

Installing the Central Rack (CR) and Expansion Rack (ER)

2-6

 

 

 

2.3

Segmented CR

2-8

 

 

 

2.4

Subdivided CR

2-9

 

 

 

2.5

Mounting and Grounding the Racks

2-10

 

 

 

2.6

Chassis Terminal Connection in the Non-Isolated Configuration

2-16

 

 

 

2.7

Methods of Ventilation

2-18

 

 

 

2.8

Changing the Ventilation with the Cable Duct and Fan Subassembly

2-20

 

 

 

2.9

Installing the Fan Subassembly

2-22

 

 

 

2.10

Installing the Cable Duct

2-24

 

 

 

2.11

Choosing and Setting up Cabinets with the S7-400

2-25

 

 

 

2.12

Rules for the Arrangement of Modules

2-29

 

 

 

2.13

Installing Modules in a Rack

2-30

 

 

 

2.14

Marking the Modules with Slot Labels

2-33

 

 

 

2.15

Methods of Expansion and Networking

2-34

 

 

 

2.16

Accessories

2-35

 

 

 

Automation System S7-400

Hardware and Installation

2-1

A5E00850741-01

 

Page 17
Image 17
Siemens S7-400 installation manual Chapter Overview, Section Description