Wiring the S7-400

S7-400 in the Overall Installation

L1

L2

L3

N

PE

Shown in Figure 4-1 is the position of the S7-400 in the overall installation (load current power supply and grounding concept) with supply from a TN-S system.

Note: The arrangement of supply terminals shown is not the actual arrangement; it has been chosen for reasons of clarity.

Low-voltage distribution e.g. TN-S system (3 x 400 V)

¡

L1

N

Racks

PS

Cabinet

CPU

SM

L+

Data

M

P

E

¢

AC

AC

Signal modules

Ground bus in cabinet

©

£Load circuit

24 to 230 VAC for AC modules

AC

 

©

 

 

DC

£

Load circuit 5 to 60 VDC

 

 

 

 

 

for isolated DC modules

Figure 4-1 Operating the S7-400 from a Grounded Supply

4-6

Automation System S7-400

Hardware and Installation

 

A5E00850741-01

Page 66
Image 66
Siemens installation manual S7-400 in the Overall Installation, Cpu