Preparation Overview
The purpose of the preparation section is to help you prepare your machine for operation. The list below outlines this basic process. Specific steps for each of these points will be covered in detail later in this section.
The typical preparation process is as follows:
1.Unpack the lathe and inventory the contents of the box/crate.
2.Clean the lathe and its components.
3.Identify an acceptable location for the lathe and move it to that location.
4.Level the lathe and either bolt it to the floor or place it on mounts.
5.Assemble the loose components and make any necessary adjustments or inspections to ensure the lathe is ready for operation.
6.Check/lubricate the lathe.
7.Connect the lathe to the power source.
8.Test run the lathe to make sure it functions properly.
9.Perform the spindle
Things You'll Need
To complete the preparation process, you will need the following items:
For Lifting and Moving
ss!!FORKLIFT ORLOTHERTPOWERRLIFTINGHDEVICE RATED for at least 5000 lbs.
ss,IFTINGTstraps rated for at least 5000 lbs. each
ss/PTIONAL #HAIN WSAFETYHHOOK RATED FOR ATF least 5000 lbs. each
ssTwo other people for moving machine ss Two 12" 2x6's
ss 0RECISIONILEVEL
For Power Connection
ssA power source that meets the minimum circuit requirements for this machine (review the Power Supply section on Page 19 for
details)
ssAn electrician or qualified service personnel to ensure a safe and
For Assembly
ssCotton rags
ssMineral spirits
ssQuality metal protectant oil ss 3AFETY glasses
ss Wrench or socket 21mm ss Wrench or socket 19mm
ss &LOOROmounting hardware as needed ss Standard screwdriver #2