SpectraLink Corporation | Link WTS Installation and Operation |
5. Install Link Wireless Telephone System
5.1Survey Site
Check the site to be sure pre- installation work has been completed correctly. This includes:
∙Location chosen for the MCU is adequate, and power is available.
∙Wiring to Base Station locations has been pulled and correctly terminated.
∙Phone lines for the Wireless Telephones are installed and properly terminated.
∙Dedicated line is available for remote access to diagnostic modem.
∙Telephone system administrator is
If the work has not been completed, the SpectraLink installer can leave the site and reschedule the installation when the items have been completed or corrected, or assist in preparing the site.
5.2Check Components
The following items should be at the installation site.
∙Link 150 M3 Master Control Unit – Depending on the size of your system, there may be up to four MCUs, which will be chained together to extend the coverage area.
!M3 MCUs. Link 150 Model 2 MCUs or Model 1 MCUs cannot be used in an M3 system.
∙AC Adapter – Supplies power to the Link 150 M3 MCU.The Link Wireless Telephone System MUST contain only Link 150
Use only the provided Class II AC Adapter with output 24VDC, 1A.
∙IPC Cable – Each MCU is shipped with one
∙Base Stations – SpectraLink Part Number RCC 400/410 or RCO 400/410 (for outdoor use). Your system may have up to four Base Stations for each MCU shipped.
∙Base Station Mounting Hardware – A ceiling clip and plastic bolt used to attach each Base Station to the
∙MCU Mounting Hardware – four
∙ESD Bonding Straps – to provide static protection for the MCU.
Part Number: | Page 18 |