Mount Base Stations On Finished Ceilings

If your site does not have a dropped tile ceiling, the Base Station can be mounted to a finished ceiling or wall with a 4-5" long 1/4" –20 TPI plastic or nylon screw or bolt (such as a lag screw).

!The customer's wire contractor is responsible for this installation.

1.Drill two holes approximately one inch apart. Make the holes large enough to accommodate the RJ-45 connector and a bolt to secure the Base Station.

2.Insert a wide washer above the ceiling, then screw the bolt into the beam or ceiling.

3.Insert three nuts on the bolt, then screw the Base Station into the bolt, being careful not to insert the bolt more than 1/3 inch, five full turns, into the Base Station.

If the ceiling is open with I-beams or pipe construction, mount the Base Station with I- beam clamps or pipe clamps.