SpectraLink Corporation

Link WTS Installation and Operation

This table lists the installation steps and the person usually responsible for each step.

ü

Task

Wire

 

System

Description

Contractor

Installer

Admin

 

 

 

 

 

 

 

Site Preparation

 

 

 

 

 

 

 

 

 

Determine Location of MCU

 

 

ü

 

 

 

 

 

 

 

 

 

 

Run Cable for System

 

 

 

 

 

 

 

 

 

Run Cable to Base Station Locations

ü

 

 

 

 

 

 

 

 

 

 

 

 

Pull Cable

ü

 

 

 

 

 

 

 

 

 

 

 

 

Terminate Cable at Base Station Locations

ü

 

 

 

 

 

 

 

 

 

 

 

 

Prepare and Install Demarc Blocks

ü

 

 

 

 

 

 

 

 

 

 

 

 

Assign and Program Ports

 

 

ü

 

 

 

 

 

 

 

 

 

 

Connect Cables to Demarc Blocks

ü

 

 

 

 

 

 

 

 

 

 

 

 

Install SpectraLink System

 

 

 

 

 

 

 

 

 

Survey Site and Check Components

 

ü

 

 

 

 

 

 

 

 

 

 

 

Install MCUs

 

ü

 

 

 

 

 

 

 

 

 

 

 

Install Base Stations

 

ü

 

 

 

 

 

 

 

 

 

 

 

Install Outdoor Base Stations

ü

 

 

 

 

 

 

 

 

 

 

 

 

Connect and Register Wireless

 

ü

 

 

 

 

 

 

Telephones

 

 

 

 

 

 

 

 

 

Set Up Diagnostic Modem

 

ü

 

 

 

 

 

 

 

 

 

 

 

Register Wireless Telephones

 

ü

 

 

 

 

 

 

 

 

 

 

 

Program Wireless Telephone Features

 

 

ü

 

 

 

 

 

 

 

 

 

 

Test Wireless Telephones

 

ü

 

 

 

 

 

 

 

 

 

 

 

Site Certification

 

ü

 

 

 

 

 

 

 

 

 

 

Part Number: 72-0075-01-C-W.doc

Page 2

Page 13
Image 13
SpectraLink 150 M3 MCU manual SpectraLink Corporation Link WTS Installation and Operation