Sterling Plumbing 882.00254.00 specifications Setting Up Stations, Setting Up a Single Station

Models: 882.00254.00

1 91
Download 91 pages 60.87 Kb
Page 44
Image 44

Setting Up Stations

Before starting the system, you must define several settings for each station, such as which pump conveys material to it and whether the station has a slide gate. This section first discusses how to use the controller’s menu system to configure stations. The table on pp. 73– 77 discusses the individual choices.

Setting Up a Single Station

1.Go to the Station Summary screen if needed.

To reach this screen from any other screen, touch Stations on the right-hand side of the screen. The Station Summary screen appears:

2.Touch the icon for the station you want to set up, and hold it for several seconds. The Station n Operator screen for the selected station appears:

7/50D Plus or 7/50D Controller

Chapter 3: Installation

43

Page 44
Image 44
Sterling Plumbing 882.00254.00 specifications Setting Up Stations, Setting Up a Single Station