Name | Description | Options | Default |
Material set to n | Number for the material line that should be | Ø | 0 (= not |
| connected to this station. |
| assigned) |
(Material actual) | Display only. Number (address) for the material |
|
|
| line that is actually connected to this station. | — | — |
| This information is displayed for your reference | ||
|
|
| |
| in troubleshooting. |
|
|
RPV Options |
|
|
|
RPV (Remote | This option allows the system to use a remote | disabled, | disabled |
Proportioning Valve) | proportioning valve to mix two different | enabled PLC, |
|
| materials, typically virgin and regrind materials, | enabled local |
|
| during a convey cycle. Touching RPV repeatedly |
|
|
| at the Station n Setup screen steps through the |
|
|
| three choices. |
|
|
| Enable this option with PLC control if you will be |
|
|
| adjusting the mix from the controller’s touch |
|
|
| screen. |
|
|
| Enable this option with local control if the station |
|
|
| operator will be adjusting the mix using a timer |
|
|
| box at the station. |
|
|
RPV material B | Percentage of the additive material to be | Ø | 30% |
| included in the mix. This setting applies only |
|
|
| when RPV is enabled with PLC control. The |
|
|
| system is set up so that, if there are any |
|
|
| inaccuracies in the proportions, the mix will |
|
|
| contain more Material A and less Material B |
|
|
| than specified here. |
|
|
Cycle time | Number of seconds for each cycle in depositing | 10 sec. | |
| Material A and Material B during the convey |
|
|
| time. This setting applies only when RPV is |
|
|
| enabled with PLC control. Example: If you set |
|
|
| convey time to 30 seconds, cycle time to 10 |
|
|
| seconds, and Material B to 30% (so Material A |
|
|
| is 70%), the system will convey as follows: |
|
|
| Material A for 7 seconds |
|
|
| Material B for 3 seconds (end cycle 1) |
|
|
| Material A for 7 seconds |
|
|
| Material B for 3 seconds (end cycle 2) |
|
|
| Material A for 7 seconds |
|
|
| Material B for 3 seconds (end cycle 3) |
|
|
| In a |
|
|
| before completion if the station becomes full. |
|
|
| The cycle time should divide evenly into the |
|
|
| convey time. |
|
|
7/50D Plus or 7/50D Controller | Chapter 6: Configurable Settings | 77 |