
Appendix B: Maintenance
Figure
The chassis section is already installed on the unit. The position of the rear rack mounting can be adjusted to suit the depth of the rack. Approximately six inches of clearance is required between the rear panel of the unit and any rear cabinet panel to allow for connector space and adequate air circulation.
Installing the MTM400 Unit
Refer to Figure
1.Pull the
2.Insert the MTM400 chassis sections into the
3.Press the stop latches and push the unit toward the rack until the latches snap into their holes.
4.Press the stop latches again and push the unit fully into the rack.
5.Tighten the front panel retaining screw.
MTM400 MPEG Transport Stream Monitor User Manual |