6 F 3 H 1 0 0 1
8.3.7 Changing the Power Supply to Maintenance Bypass
This UPS must be completely shut down when performing maintenance and inspections. In such cases, the power supply to the load will go through the maintenance bypass. Table 8.8 shows the procedure used to change the power supply to this maintenance bypass. Table 8.9 shows how to change the power supply from the maintenance bypass back to the UPS.
Table 8.8 Changing From UPS to maintenance Bypass Power Supply
Step | Procedure | LCD/LED Status (After Execution) |
|
| ||
|
|
| ||||
4 | Turn ON maintenance |
| BYPASS |
|
|
|
| bypass AC circuit |
|
|
|
| |
| breaker 52M. *,** |
|
|
|
|
|
|
|
| MOVE #52C AND #52L TO ‘ON’ |
| ||
|
| ~ | ~ | ~ | UPS |
|
|
|
|
|
| ||
|
| AC INPUT | CONVERTER | INVERTER |
|
|
|
|
| FLOAT CHARGE |
| AC | ~ |
|
|
|
|
|
| |
|
| BATTERIES | EQUAL CHARGE |
| SWITCH |
|
|
|
| DISCHARGE |
|
| AC OUTPUT |
|
|
|
|
|
| |
|
| ~ |
|
| BYPASS |
|
|
| BYPASS INPUT |
|
|
| |
|
|
|
|
|
|
| 52R | 72B | 52C | 52M | 52L |
MCCB | OFF | OFF | ON | ON | ON |
5 | Perform steps 6 | When the UPS is shutdown completely, nothing at all will be | |||||
| through 11 in Table 8.4 displayed on the LCD screen and all LEDs will be unlit. | ||||||
| “Complete Shutdown” |
|
|
|
|
|
|
| on page 34 to shut |
| 52R | 72B | 52C | 52M | 52L |
| down the UPS |
| |||||
| completely. | MCCB | OFF | OFF | OFF | ON | OFF |
| →Change to | ||||||
|
|
|
|
|
|
| |
| maintenance bypass |
|
|
|
|
|
|
| power supply |
|
|
|
|
|
|
| complete. |
|
|
|
|
|
|
*During load operation, always operate the circuit breakers in the following order : 52M ON→52lL OFF→ 52C OFF
**When power is supplied to the UPS, circuit breaker 52M cannot be turned on.
- 40 -