Wayne-Dalton 9100, 9400, 9600 installation instructions Vertical Track

Models: 9600 9100 9400

1 40
Download 40 pages 42.94 Kb
Page 10
Image 10
Vertical Track

5

Vertical Track

fLAGANGLE

 

 

 

Tools Needed:

IMPORTANT: The tops of the

5/16” x 2” LAG

 

vertical tracks must be level

3/16” Drill Bit

SCREWS

from side to side. If the bottom

 

 

 

Power Drill

section was shimmed to level

 

it, The vertical track on the

 

 

 

7/16” Socket

shimmed side must be raised the

CABLE

height of the shim.

 

Driver

 

 

 

Tape Measure

Position the left hand vertical track

 

assembly over the rollers of the bottom

VERTICAL

 

Level

section. Make sure the counterbalance

TRACK

cable is located between the rollers and

ASSEMBLY

 

Step Ladder

the door jamb.

 

 

 

 

NOTE: Vertical track needs held 1/2” off

BOTTOM SECTION

 

 

 

ground.

 

Drill 3/16” pilot holes for the lag screws. Loosely fasten jamb brackets and flagangle to the jamb using 5/16” x 2” lag screws.

JAMB

On the bottom jamb bracket, tighten the lag screw securing the bottom jamb bracket to the jamb, to maintain the 5/8” spacing.

BRACKET

Hang the cable drum over the flagangle.

Repeat for the right hand side.

quick install jamb bracket

LAG SCREW

locations

lag

screw

vertical track

BOTTOM

SECTION

roller

5/8”

10

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Page 10
Image 10
Wayne-Dalton 9100, 9400, 9600 installation instructions Vertical Track