5 | Vertical Track | fLAGANGLE | |
| |||
|
| ||
Tools Needed: | IMPORTANT: The tops of the | 5/16” x 2” LAG | |
| vertical tracks must be level | ||
3/16” Drill Bit | SCREWS | ||
from side to side. If the bottom |
| ||
|
| ||
Power Drill | section was shimmed to level |
| |
it, The vertical track on the |
| ||
|
| ||
7/16” Socket | shimmed side must be raised the | CABLE | |
height of the shim. |
| ||
Driver |
| ||
|
| ||
Tape Measure | Position the left hand vertical track |
| |
assembly over the rollers of the bottom | VERTICAL | ||
| |||
Level | section. Make sure the counterbalance | TRACK | |
cable is located between the rollers and | ASSEMBLY | ||
| |||
Step Ladder | the door jamb. |
| |
|
| ||
| NOTE: Vertical track needs held 1/2” off | BOTTOM SECTION | |
|
| ||
| ground. |
|
Drill 3/16” pilot holes for the lag screws. Loosely fasten jamb brackets and flagangle to the jamb using 5/16” x 2” lag screws.
JAMB
On the bottom jamb bracket, tighten the lag screw securing the bottom jamb bracket to the jamb, to maintain the 5/8” spacing.
BRACKET
Hang the cable drum over the flagangle.
Repeat for the right hand side.
quick install jamb bracket
LAG SCREW
locations
lag
screw
vertical track
BOTTOM
SECTION
roller | 5/8” |
10
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at