Wayne-Dalton 9100, 9400 Installation, Cutting Vertical Track and, Installing Q.I. Jamb Brackets

Models: 9600 9100 9400

1 40
Download 40 pages 42.94 Kb
Page 7
Image 7
Installation

Installation

Begin the installation of the door by checking the opening. It must be the same size as the door. Vertical jambs must be plumb and the header level. Side clearance, from edge of door to wall, must be minimum of 3-1/2” (89 mm) on each side.

IMPORTANT: STAINLESS STEEL OR PT 2000 COATED LAG SCREWS MUST BE USED WHEN INSTALLING CENTER BEARING BRACKETS, END BRACKETS, JAMB BRACKETS, OPERATOR MOUNTING/SUPPORT BRACKETS AND DISCONNECT BRACKETS ON TREATED LUMBER (PRESERVATIVE-TREATED). STAINLESS STEEL LAG SCREWS ARE NOT NECESSARY WHEN INSTALLING PRODUCTS ON UNTREATED LUMBER.

NOTE: It is recommended that 5/16” x 2” lag screws will be pilot drilled using a 3/16” drill bit, prior to fastening.

NOTE: If you have riveted track, skip steps, 1 through 2 and proceed to step3.

1

Cutting Vertical Track and

 

 

 

 

 

 

Installing Q.I. Jamb Brackets

 

 

Tools Needed:

Vertical track must be cut to the proper

 

 

length prior to installation.

 

 

Tape Measure

 

 

IMPORTANT: Doors that are 7’-0” or

 

 

Hacksaw

 

 

8’-0” in height do not require cutting

 

 

Power Drill

 

 

the vertical track.

 

 

5/16” Drill Bit

Determine the radius of your horizontal

 

 

 

 

 

 

track.

 

 

 

 

NOTE: All Portland tracks have the radius

 

3rd SET HOLES

 

 

 

 

stamped on the side of the track.

left side shown

 

 

Using this measurement, refer to the vertical

 

 

 

 

 

track cutting chart to determine the length

 

 

 

of the vertical track. Cut the track off at the

 

 

 

top.

 

 

 

 

Now, two holes must be drilled into the

 

 

 

top of the cut vertical track. Refer to the

 

 

 

illustration shown for hole locations. Use a

 

 

 

5/16” drill bit.

 

2nd SET HOLES

 

Repeat for other vertical track.

 

 

 

 

 

Measure the length of the vertical tracks.

 

 

 

Using the jamb bracket schedule, determine

 

 

 

the placement of the jamb brackets for your

 

 

 

door height.

 

 

 

To install the jamb brackets, align the

right side shown

 

 

twistlock tab on the quick install jamb

 

 

 

bracket with the quick install feature in the

twistlock tab

 

 

track and turn the bracket perpendicular to

 

 

 

the track so the mounting flange is toward

 

 

 

the back (flat) leg of the track.

 

 

Horizontal

 

 

 

 

track

 

 

QI jamb bracket

1st SET HOLES

 

 

 

Top

 

 

12”

Stamped

hole

 

12”

 

 

 

 

radius

 

 

 

 

Middle

 

 

 

 

hole

 

 

 

 

Bottom

 

 

 

 

hole

 

 

 

 

quick install feature

 

 

 

 

 

7

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

INSTALLATION

Page 7
Image 7
Wayne-Dalton 9100, 9400, 9600 Installation, Cutting Vertical Track and, Installing Q.I. Jamb Brackets