|
|
6 | Stacking Sections |
| |
|
|
Tools Needed: | NOTE: For door section identification |
Power Drill | see page 4. |
7/16” Socket | NOTE: Make sure hinge leafs are |
Driver | flipped down, when stacking another |
| section on top. |
| Place rollers in hinge tubes of the |
| second section (lock section). |
| With assistance, lift the second section |
| and guide rollers into the vertical |
| tracks. |
| Maintaining section vertical alignment; |
| starting with the center hinge first, |
| flip up the hinge leaf, and hold it tight |
| against the section. Secure it to the |
| section with (3) |
| tapping screws. |
| Attach center hinges first, then attach |
| the end hinges last. |
| Now, secure the end hinge leafs to the |
| section with (2) 1/4” |
| tapping screws and fasten them in a |
| low to high inclination (from bottom |
| left hole, to upper right hole, for the left |
| side of the door and from bottom right |
| hole, to upper left hole, for the right |
| side of the door). |
| Repeat for other section(s) except top |
| section. |
| IMPORTANT: Push & hold the |
| hinge leaf against section while |
| securing with |
| tapping screws. End Hinges have |
| (2) screws and Intermediate |
| hinges have (3) screws. |
| NOTE: Install lock at this time (sold |
| separately). See instructions in |
| OPTIONAL SIDE LOCK INSTALLATION |
| on page 32. |
LOCK SECTION
DO NOT USE
(2)
SELF TAPPING SCREWS
end hinges (left hand shown, right hinge symmetrically opposite)
(3)
INSTALLATION
intermediate hinges
11
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at