Wayne-Dalton 9400, 9100, 9600 installation instructions Top Section, Installation

Models: 9600 9100 9400

1 40
Download 40 pages 42.94 Kb
Page 15
Image 15
Top Section

 

 

 

 

 

11

Top Section

 

 

 

 

 

 

 

 

 

 

 

 

Tools Needed:

Place the top section in the opening

 

 

 

 

door width

 

 

and vertically align with lower sections.

 

 

Hammer

 

+3-3/8” to 3-1/2”

 

 

 

 

Temporarily secure the top section by

 

 

Tape Measure

 

 

 

driving a nail in the header near the

 

 

 

 

 

 

 

Power Drill

center of the door and bending it over

 

 

 

the top section.

 

 

 

 

 

 

 

7/16” Socket

Now flip up hinge leaf against section,

 

 

 

Driver

 

 

 

 

fastening center hinges first, and end

 

 

 

7/16” Wrench

hinges last. (Refer to Step 6).

 

 

 

When installing a door with Torquemaster® Plus counterbalance system, vertical track alignment is critical.

Position flagangle between 1-11/16” (43 mm) to 1-3/4” (44 mm) from the edge of the door. Tighten the bottom lag screw. Flagangles must be parallel to the door sections.

Repeat for opposite side.

IMPORTANT: THE DIMENSION

 

BETWEEN THE FLAGANGLES MUST BE

NAIL

DOOR WIDTH PLUS 3-3/8” (86MM) TO

 

3-1/2” (89 MM) FOR SMOOTH, SAFE

 

DOOR OPERATION.

 

Now complete the vertical track installation by securing the center jamb bracket(s), flagangle, and connection of the vertical track/flagangle.

Repeat for opposite side.

 

top section

1-11/16” TO 1-3/4”

FLAGANGLE

top

SECTION

15

INSTALLATION

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Page 15
Image 15
Wayne-Dalton 9400, 9100, 9600 installation instructions Top Section, Installation