Emerson 4015 installation instructions Table of Contents

Page 3

Installation Instructions

 

IM584000300

Spec. No. 584000300 (Model 4015-X003)

Issue AB, April 3, 2013

TABLE OF CONTENTS

 

 

 

CONTENTS

 

PAGE

IMPORTANT SAFETY INSTRUCTIONS

 

iii

General Safety

 

iii

Voltages

 

iii

Battery (if equipped)

 

iv

Personal Protective Equipment (PPE)

 

v

Maintenance and Servicing Procedures

 

vi

Circuit Card Handling

 

vi

STATIC WARNING

 

vii

CHAPTER 1. GENERAL INFORMATION AND INSTALLATION ACCEPTANCE

 

 

CHECKLIST

 

1

Customer Documentation Package

 

1

System Packaging

 

1

Power and Control Sub-Rack (List 11, 12)

 

2

DC Load Distribution Sub-Rack (List 21, 22, 23, 24)

 

3

Battery Tray (List 91, 92)

 

4

Recommended Tools and Test Equipment

 

5

Installation Acceptance Checklist

 

6

General

 

6

Checklist –Factory Integrated System (List R1, R2)

 

6

Checklist – Customer Integrated System (ship loose)

 

7

CHAPTER 2. INSTALLING THE SYSTEM

 

8

General Requirements

 

8

Inspecting the Equipment and Storing for Delayed Installations

 

9

Inspecting the Equipment

 

9

Storing for Delayed Installation

 

9

Securing the IT Rack to the Floor

 

9

Factory Integrated Systems (List R1, R2)

 

9

Installing Individual Sub-Racks into Cutomer Provided IT Rack (not applicable with List R1, R2)

...................

10

Customer Supplied IT Rack Guidelines

 

10

Installing the Sub-Racks

 

10

Electrically Interconnecting the Sub-Rack(s)

 

12

CHAPTER 3. MAKING ELECTRICAL CONNECTIONS

 

13

Important Safety Instructions

 

13

Wiring Considerations

 

13

Torque

 

13

Output Ground Configurations

 

13

Cable Routing

 

13

When System is Furnished in a Factory Provided IT Rack (List R1, R2)

 

13

When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rack

15

Table of Contents

 

 

Page i

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 3
Contents IM584000300 Issue AB, April 3 Installation InstructionsPage Table of Contents Issue AB, April 3 Spec. No Model AC Input Voltages DC Input/Output Voltages General SafetyImportant Safety Instructions VoltagesBattery if Equipped Personal Protective Equipment PPE General Maintenance and Servicing ProceduresDual Hazardous Input Power Sources Circuit Card HandlingStatic Warning IM584000300 USB Drive with All Customer Documentation Bound System Installation ManualCustomer Documentation Package System PackagingRectifiers Part Number Qty Power and Control Sub-Rack List 11Temperature Probes List 98 Part Number Qty General Part Number QtyDC Load Distribution Sub-Rack List 21, 22, 23 Battery Tray List 91 Recommended Tools and Test Equipment Installation Acceptance Checklist Checklist -Factory Integrated System List R1, R2General Checklist Customer Integrated System ship loose Air Flow Diagram Installing the System General RequirementsAir Flow Inspecting the Equipment Inspecting the Equipment Storing for Delayed InstallationsStoring for Delayed Installation Securing the IT Rack to the FloorCustomer Supplied IT Rack Guidelines Installing Individual SUB-RACKS Into CutomerInstalling the Sub-Racks For customer provided IT rack installation onlyIM584000300 Mounting Details Electrically Interconnecting the Sub-RacksCable Routing Important Safety Instructions Wiring ConsiderationsOutput Ground Configurations TorqueSub-Rack IM584000300 Removable Panel Sub-Rack Grounding Frame Ground Hrmg Configurations Only Bus Grounding ConnectionTasks to be Performed for Customer Integrated Systems GroundingBattery Tray Issue AB, April 3 Spec. No Model Load Distribution Sub-RackLoad Distribution Sub-Rack Power and Control Sub-Rack Sub-Racks Electrical Interconnections Sub-Rack Interconnections Making Electrical Connections Power and Control Sub-Rack Battery Tray Tasks to be Perform for ALL Installations IT Rack Grounding Frame GroundConduit Grounding Frame Ground Grounding Scheme Diagram Hrmg System GroundingNPG System Grounding Suggested AC Input Power Connections Making Electrical Connections AC Input Power ConnectionsNPG Negative Pole Ground Configuration Hrmg High Resistance Midpoint Ground ConfigurationLoad Distribution Sub-Rack Battery Manufacturer Information Installing Battery Sub-TraysRefer to -12as this procedure is performed Battery Sub-Trays External Battery Connections if required Customer Connection To External Battery Strings External Battery Connections Making Electrical ConnectionsProgrammable Relay Outputs IB2 ACU+ Controller Interface Board Connections if requiredDigital Inputs and Programmable Relay Outputs Digital InputsInstallation Instructions Issue AB, April 3 Spec. No Model Temperature ProbesACU+ Controller Ethernet Connection if required Power and Control Sub-Rack Programmable J7-3 None J7-1 J7-6 J6-5J6-3 None J6-1 J6-6 J6-4 None J6-2 J7-5Power and Control Chapter Installing the Rectifier Module Circuit Breaker Locations Initially Starting the System Initial Startup PreparationInitially Starting the System ACU+ Controller Local Indicators and Navigation Keys ACU+ Controller InitializationVersion ***** Starting… IM584000300 Changing Battery Capacity Rating in the ACU+ Verifying the Configuration FileTo Change a Parameter Checking Basic System SettingsProcedure To Select a Sub-Menu To Enter a PasswordPage Configuring the ACU+ Identification of Rectifiers Checking System Status Checking the System Shutdown CircuitReference Documents Final StepsECO Change Issue Number Description of ChangeFor More Information NetPerform Optimization Services