Emerson 4015 installation instructions Power and Control Sub-Rack

Page 47

Installation Instructions

IM584000300

Spec. No. 584000300 (Model 4015-X003)

Issue AB, April 3, 2013

 

 

I/O Wiring

I/O Wiring Opening

Cable Tray

for 25mm (1”) Conduit

Top cover

 

removed in

 

illustration for

 

clarity only.

 

Power and Control

Sub-Rack

Front

10/100M Ethernet Port (RJ-45)

ESC

ENT

ACU+

 

ACU+ IB2

Interface Board

Top View

Customer Input/Output (I/O) Connections

 

 

ACU+ IB2 Interface Board

 

 

 

 

 

 

 

 

Relay Output Term. Blocks

 

Relay

J9

 

J8

 

 

J7

 

J6

 

No.

7

 

 

5

 

 

 

3

 

 

1

 

NO

C

NC NO

C

 

NC

NO

C

NC

NO

C

NC

5

3

1

5

3

 

1

5

3

1

5

3

1

NO C NC NO C NC

NO

C

NC NO C

NC

Relay

6

4

2

6

4

2

6

4

2

6

4

2

No.

 

8

 

 

6

 

4

 

2

J1

SW1

Digital Input Term. Blocks

J5 J4 J3

 

8

7

6

5 4

3

2 1

Input

 

 

 

 

 

 

 

 

 

No. ()

5

3

1

5

3

1

5

3

1

 

6

4

2

6

4

2

6

4

2

J12

 

8

7

6

5 4

3 2 1

Input

 

 

 

 

 

 

 

 

 

No. (+)

 

 

 

 

 

 

 

 

 

J11

J2

IB2 TEMP PROBE 2

IB2 TEMP PROBE 1

Connector to ACU+

Switch sections must be set to this position to interface with the ACU+ controller.

J3-J9:

Wire Size Capacity: 16-26 AWG (1.5-0.5mm2).

Recommended Torque: 2.2 in-lbs (0.25 Nm).

Figure 3-14

External Interface Connections

Chapter 3. Making Electrical Connections

Page 37

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 47
Contents IM584000300 Issue AB, April 3 Installation InstructionsPage Table of Contents Issue AB, April 3 Spec. No Model AC Input Voltages DC Input/Output Voltages General SafetyImportant Safety Instructions VoltagesBattery if Equipped Personal Protective Equipment PPE General Maintenance and Servicing ProceduresDual Hazardous Input Power Sources Circuit Card HandlingStatic Warning IM584000300 USB Drive with All Customer Documentation Bound System Installation ManualCustomer Documentation Package System PackagingRectifiers Part Number Qty Power and Control Sub-Rack List 11Temperature Probes List 98 Part Number Qty General Part Number QtyDC Load Distribution Sub-Rack List 21, 22, 23 Battery Tray List 91 Recommended Tools and Test Equipment General Installation Acceptance ChecklistChecklist -Factory Integrated System List R1, R2 Checklist Customer Integrated System ship loose Air Flow Air Flow Diagram Installing the SystemGeneral Requirements Inspecting the Equipment Inspecting the Equipment Storing for Delayed InstallationsStoring for Delayed Installation Securing the IT Rack to the FloorCustomer Supplied IT Rack Guidelines Installing Individual SUB-RACKS Into CutomerInstalling the Sub-Racks For customer provided IT rack installation onlyIM584000300 Mounting Details Electrically Interconnecting the Sub-RacksCable Routing Important Safety Instructions Wiring ConsiderationsOutput Ground Configurations TorqueSub-Rack IM584000300 Removable Panel Sub-Rack Grounding Frame Ground Hrmg Configurations Only Bus Grounding ConnectionTasks to be Performed for Customer Integrated Systems GroundingBattery Tray Issue AB, April 3 Spec. No Model Load Distribution Sub-RackLoad Distribution Sub-Rack Power and Control Sub-Rack Sub-Racks Electrical Interconnections Sub-Rack Interconnections Making Electrical Connections Power and Control Sub-Rack Battery Tray Conduit Grounding Frame Ground Tasks to be Perform for ALL InstallationsIT Rack Grounding Frame Ground NPG System Grounding Grounding Scheme DiagramHrmg System Grounding Suggested AC Input Power Connections Making Electrical Connections AC Input Power ConnectionsNPG Negative Pole Ground Configuration Hrmg High Resistance Midpoint Ground ConfigurationLoad Distribution Sub-Rack Refer to -12as this procedure is performed Battery Manufacturer InformationInstalling Battery Sub-Trays Battery Sub-Trays External Battery Connections if required Customer Connection To External Battery Strings External Battery Connections Making Electrical ConnectionsProgrammable Relay Outputs IB2 ACU+ Controller Interface Board Connections if requiredDigital Inputs and Programmable Relay Outputs Digital InputsACU+ Controller Ethernet Connection if required Installation Instructions Issue AB, April 3 Spec. No ModelTemperature Probes Power and Control Sub-Rack Programmable J7-3 None J7-1 J7-6 J6-5J6-3 None J6-1 J6-6 J6-4 None J6-2 J7-5Power and Control Chapter Installing the Rectifier Module Circuit Breaker Locations Initially Starting the System Initial Startup PreparationInitially Starting the System Version ***** Starting… ACU+ Controller Local Indicators and Navigation KeysACU+ Controller Initialization IM584000300 Changing Battery Capacity Rating in the ACU+ Verifying the Configuration FileTo Change a Parameter Checking Basic System SettingsProcedure To Select a Sub-Menu To Enter a PasswordPage Configuring the ACU+ Identification of Rectifiers Checking System Status Checking the System Shutdown CircuitReference Documents Final StepsECO Change Issue Number Description of ChangeFor More Information NetPerform Optimization Services