Emerson 4015 Configuring the ACU+ Identification of Rectifiers, Procedure

Page 59

Installation Instructions

IM584000300

Spec. No. 584000300 (Model 4015-X003)

Issue AB, April 3, 2013

 

 

CONFIGURING THE ACU+ IDENTIFICATION OF RECTIFIERS

When rectifier modules are all installed prior to applying power and starting the system, the order in which the ACU+ identifies the rectifiers is by serial number (lowest serial number is Rect 1, next lowest is Rect 2, etc.). If you prefer the ACU+ to identify the rectifiers by position in the system, perform the following procedure.

Procedure

1)With the Main screen displayed, press ENT to go to the Main Menu. Navigate to and select “Settings” (ENT).

2)If a password screen opens, a password must be entered to allow the User to make adjustments. If a password was previously entered and has not yet timed out, skip this step and proceed to step 3). Otherwise, to enter a password, with the cursor at the User Name field (default is “Admin”), press the down arrow key to move cursor down to the password line. Press ENT. “0” is highlighted. Press the up arrow key once to change the “0” to”1” (default password is “1”), then press ENT twice. (Note: If you have been assigned a unique User Name and password, follow this procedure to enter these.)

3)With the Settings menu screen displayed, navigate to and select “Rectifier” (ENT).

4)Navigate to “Rect #” (# is used here to represent the rectifier identification number). Press ENT. The rectifier # menu screen is displayed, and the green LED on one rectifier starts flashing. This is the rectifier currently identified by the ACU+ as rectifier #. (If this is not the rectifier you want, press ESC to return to rectifier menu screen and select a different rectifier.)

5)Navigate to and select “Rectifier ID”. Press ENT. Use the up or down keys to change the ACU+ identification number for the flashing rectifier. Press ENT.

6)Press ESC to return to rectifier menu screen.

7)Repeat steps 4) through 6) for each of the remaining rectifiers in the system.

8)When you have finished selecting identification numbers for all rectifiers, repeatedly press ESC to return to the Main Menu.

9)Navigate to and select “Manual” (ENT) / “Rectifier” (ENT) / “All Rect Ctrl” (ENT).

10)Navigate to “Confirm ID/PH”. Press ENT. “Yes” highlights.

11)Press ENT to select the operation. Press ENT again to confirm.

Note: Check your numbering to be sure it is correct. If there where conflicts in your numbering, rectifiers with conflicts will be assigned the next available sequential number.

12) Return to the Main screen by repeatedly pressing ESC (escape).

Chapter 5. Initially Starting the System

Page 49

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 59
Contents IM584000300 Issue AB, April 3 Installation InstructionsPage Table of Contents Issue AB, April 3 Spec. No Model AC Input Voltages DC Input/Output Voltages General SafetyImportant Safety Instructions VoltagesBattery if Equipped Personal Protective Equipment PPE General Maintenance and Servicing ProceduresDual Hazardous Input Power Sources Circuit Card HandlingStatic Warning IM584000300 USB Drive with All Customer Documentation Bound System Installation ManualCustomer Documentation Package System PackagingRectifiers Part Number Qty Power and Control Sub-Rack List 11Temperature Probes List 98 Part Number Qty General Part Number QtyDC Load Distribution Sub-Rack List 21, 22, 23 Battery Tray List 91 Recommended Tools and Test Equipment General Installation Acceptance ChecklistChecklist -Factory Integrated System List R1, R2 Checklist Customer Integrated System ship loose Air Flow Air Flow Diagram Installing the SystemGeneral Requirements Inspecting the Equipment Inspecting the Equipment Storing for Delayed InstallationsStoring for Delayed Installation Securing the IT Rack to the FloorCustomer Supplied IT Rack Guidelines Installing Individual SUB-RACKS Into CutomerInstalling the Sub-Racks For customer provided IT rack installation onlyIM584000300 Mounting Details Electrically Interconnecting the Sub-RacksCable Routing Important Safety Instructions Wiring ConsiderationsOutput Ground Configurations TorqueSub-Rack IM584000300 Removable Panel Sub-Rack Grounding Frame Ground Hrmg Configurations Only Bus Grounding ConnectionTasks to be Performed for Customer Integrated Systems GroundingBattery Tray Issue AB, April 3 Spec. No Model Load Distribution Sub-RackLoad Distribution Sub-Rack Power and Control Sub-Rack Sub-Racks Electrical Interconnections Sub-Rack Interconnections Making Electrical Connections Power and Control Sub-Rack Battery Tray Conduit Grounding Frame Ground Tasks to be Perform for ALL InstallationsIT Rack Grounding Frame Ground NPG System Grounding Grounding Scheme DiagramHrmg System Grounding Suggested AC Input Power Connections Making Electrical Connections AC Input Power ConnectionsNPG Negative Pole Ground Configuration Hrmg High Resistance Midpoint Ground ConfigurationLoad Distribution Sub-Rack Refer to -12as this procedure is performed Battery Manufacturer InformationInstalling Battery Sub-Trays Battery Sub-Trays External Battery Connections if required Customer Connection To External Battery Strings External Battery Connections Making Electrical ConnectionsProgrammable Relay Outputs IB2 ACU+ Controller Interface Board Connections if requiredDigital Inputs and Programmable Relay Outputs Digital InputsACU+ Controller Ethernet Connection if required Installation Instructions Issue AB, April 3 Spec. No ModelTemperature Probes Power and Control Sub-Rack Programmable J7-3 None J7-1 J7-6 J6-5J6-3 None J6-1 J6-6 J6-4 None J6-2 J7-5Power and Control Chapter Installing the Rectifier Module Circuit Breaker Locations Initially Starting the System Initial Startup PreparationInitially Starting the System Version ***** Starting… ACU+ Controller Local Indicators and Navigation KeysACU+ Controller Initialization IM584000300 Changing Battery Capacity Rating in the ACU+ Verifying the Configuration FileTo Change a Parameter Checking Basic System SettingsProcedure To Select a Sub-Menu To Enter a PasswordPage Configuring the ACU+ Identification of Rectifiers Checking System Status Checking the System Shutdown CircuitReference Documents Final StepsECO Change Issue Number Description of ChangeFor More Information NetPerform Optimization Services