Emerson 4015 installation instructions Final Steps, Reference Documents

Page 61

Installation Instructions

IM584000300

Spec. No. 584000300 (Model 4015-X003)

Issue AB, April 3, 2013

 

 

FINAL STEPS

Procedure

1)If any ACU+ Controller configuration settings were changed, refer to the ACU+ User Instructions (UM1M820NNB-1) and save a copy of the configuration file. This file can be used to restore the ACU+ Controller settings, if required, at a later date.

Note that provided on a USB drive furnished with the system is an ACU+ configuration drawing (C-drawing) and the ACU+ configuration files loaded into the ACU+ as shipped.

2)Verify there are no external alarms and the local indicators are as shown in Table 5-2.

REFERENCE DOCUMENTS

Refer to “Customer Documentation Package” on page 1 for a list of other documents that can be referenced for additional information.

Chapter 5. Initially Starting the System

Page 51

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 61
Contents IM584000300 Issue AB, April 3 Installation InstructionsPage Table of Contents Issue AB, April 3 Spec. No Model Important Safety Instructions General SafetyVoltages AC Input Voltages DC Input/Output VoltagesBattery if Equipped Personal Protective Equipment PPE Dual Hazardous Input Power Sources Maintenance and Servicing ProceduresCircuit Card Handling GeneralStatic Warning IM584000300 Customer Documentation Package Bound System Installation ManualSystem Packaging USB Drive with All Customer DocumentationTemperature Probes List 98 Part Number Qty Power and Control Sub-Rack List 11General Part Number Qty Rectifiers Part Number QtyDC Load Distribution Sub-Rack List 21, 22, 23 Battery Tray List 91 Recommended Tools and Test Equipment Checklist -Factory Integrated System List R1, R2 Installation Acceptance ChecklistGeneral Checklist Customer Integrated System ship loose General Requirements Air Flow Diagram Installing the SystemAir Flow Storing for Delayed Installation Inspecting the Equipment Storing for Delayed InstallationsSecuring the IT Rack to the Floor Inspecting the EquipmentInstalling the Sub-Racks Installing Individual SUB-RACKS Into CutomerFor customer provided IT rack installation only Customer Supplied IT Rack GuidelinesIM584000300 Mounting Details Electrically Interconnecting the Sub-RacksOutput Ground Configurations Important Safety Instructions Wiring ConsiderationsTorque Cable RoutingSub-Rack IM584000300 Removable Panel Tasks to be Performed for Customer Integrated Systems Hrmg Configurations Only Bus Grounding ConnectionGrounding Sub-Rack Grounding Frame GroundBattery Tray Issue AB, April 3 Spec. No Model Load Distribution Sub-RackLoad Distribution Sub-Rack Power and Control Sub-Rack Sub-Racks Electrical Interconnections Sub-Rack Interconnections Making Electrical Connections Power and Control Sub-Rack Battery Tray IT Rack Grounding Frame Ground Tasks to be Perform for ALL InstallationsConduit Grounding Frame Ground Hrmg System Grounding Grounding Scheme DiagramNPG System Grounding Suggested AC Input Power Connections Making Electrical Connections AC Input Power ConnectionsNPG Negative Pole Ground Configuration Hrmg High Resistance Midpoint Ground ConfigurationLoad Distribution Sub-Rack Installing Battery Sub-Trays Battery Manufacturer InformationRefer to -12as this procedure is performed Battery Sub-Trays External Battery Connections if required Customer Connection To External Battery Strings External Battery Connections Making Electrical ConnectionsDigital Inputs and Programmable Relay Outputs IB2 ACU+ Controller Interface Board Connections if requiredDigital Inputs Programmable Relay OutputsTemperature Probes Installation Instructions Issue AB, April 3 Spec. No ModelACU+ Controller Ethernet Connection if required Power and Control Sub-Rack Programmable J6-3 None J6-1 J6-6 J6-5J6-4 None J6-2 J7-5 J7-3 None J7-1 J7-6Power and Control Chapter Installing the Rectifier Module Circuit Breaker Locations Initially Starting the System Initial Startup PreparationInitially Starting the System ACU+ Controller Initialization ACU+ Controller Local Indicators and Navigation KeysVersion ***** Starting… IM584000300 Changing Battery Capacity Rating in the ACU+ Verifying the Configuration FileProcedure To Select a Sub-Menu Checking Basic System SettingsTo Enter a Password To Change a ParameterPage Configuring the ACU+ Identification of Rectifiers Checking System Status Checking the System Shutdown CircuitReference Documents Final StepsECO Change Issue Number Description of ChangeFor More Information NetPerform Optimization Services