2)Next, the language screen appears. Press the up or down arrow key to select the desired language. Press the ENT key to confirm the selection. If no key is pressed within 10 seconds, the ACU+ selects the displayed language automatically.

3)As initialization continues, the Main screen is displayed, but with zero volts. Initialization is not complete.

4)When initialization is complete, the Main screen displays voltage and current normally, and no alarms are active.

5)System information is displayed in multiple screens. Repetitively press the up or down arrow key to view other system information screens one by one.

6)From the Main screen, press ENT to go to the “Main Menu” screen.

7)From the Main Menu, select a sub-menu by repetitively pressing the up or down arrow key. The selected sub-menu will be indicated by the cursor. Press ENT to open the sub-menu.

Note: Repeatedly press the “ESC” key to return in reverse order level by level from any sub-menu until the Main screen appears.

8)Verify and set the ACU+ Controller as required for your application. Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for procedures. Note that you will have to program the ACU+ for any temperature probes and external inputs/outputs connected to the IB2 Interface Board, and battery capacity if different then the factory default of 8.5 Ah (8.5 Ah per internal battery tray).

Chapter 5. Initially Starting the System

Page 45

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 55
Contents IM584000300 Issue AB, April 3 Installation InstructionsPage Table of Contents Issue AB, April 3 Spec. No Model AC Input Voltages DC Input/Output Voltages General SafetyImportant Safety Instructions VoltagesBattery if Equipped Personal Protective Equipment PPE General Maintenance and Servicing ProceduresDual Hazardous Input Power Sources Circuit Card HandlingStatic Warning IM584000300 USB Drive with All Customer Documentation Bound System Installation ManualCustomer Documentation Package System PackagingRectifiers Part Number Qty Power and Control Sub-Rack List 11Temperature Probes List 98 Part Number Qty General Part Number QtyDC Load Distribution Sub-Rack List 21, 22, 23 Battery Tray List 91 Recommended Tools and Test Equipment Checklist -Factory Integrated System List R1, R2 Installation Acceptance ChecklistGeneral Checklist Customer Integrated System ship loose General Requirements Air Flow Diagram Installing the SystemAir Flow Inspecting the Equipment Inspecting the Equipment Storing for Delayed InstallationsStoring for Delayed Installation Securing the IT Rack to the FloorCustomer Supplied IT Rack Guidelines Installing Individual SUB-RACKS Into CutomerInstalling the Sub-Racks For customer provided IT rack installation onlyIM584000300 Mounting Details Electrically Interconnecting the Sub-RacksCable Routing Important Safety Instructions Wiring ConsiderationsOutput Ground Configurations TorqueSub-Rack IM584000300 Removable Panel Sub-Rack Grounding Frame Ground Hrmg Configurations Only Bus Grounding ConnectionTasks to be Performed for Customer Integrated Systems GroundingBattery Tray Issue AB, April 3 Spec. No Model Load Distribution Sub-RackLoad Distribution Sub-Rack Power and Control Sub-Rack Sub-Racks Electrical Interconnections Sub-Rack Interconnections Making Electrical Connections Power and Control Sub-Rack Battery Tray IT Rack Grounding Frame Ground Tasks to be Perform for ALL InstallationsConduit Grounding Frame Ground Hrmg System Grounding Grounding Scheme DiagramNPG System Grounding Suggested AC Input Power Connections Making Electrical Connections AC Input Power ConnectionsNPG Negative Pole Ground Configuration Hrmg High Resistance Midpoint Ground ConfigurationLoad Distribution Sub-Rack Installing Battery Sub-Trays Battery Manufacturer InformationRefer to -12as this procedure is performed Battery Sub-Trays External Battery Connections if required Customer Connection To External Battery Strings External Battery Connections Making Electrical ConnectionsProgrammable Relay Outputs IB2 ACU+ Controller Interface Board Connections if requiredDigital Inputs and Programmable Relay Outputs Digital InputsTemperature Probes Installation Instructions Issue AB, April 3 Spec. No ModelACU+ Controller Ethernet Connection if required Power and Control Sub-Rack Programmable J7-3 None J7-1 J7-6 J6-5J6-3 None J6-1 J6-6 J6-4 None J6-2 J7-5Power and Control Chapter Installing the Rectifier Module Circuit Breaker Locations Initially Starting the System Initial Startup PreparationInitially Starting the System ACU+ Controller Initialization ACU+ Controller Local Indicators and Navigation KeysVersion ***** Starting… IM584000300 Changing Battery Capacity Rating in the ACU+ Verifying the Configuration FileTo Change a Parameter Checking Basic System SettingsProcedure To Select a Sub-Menu To Enter a PasswordPage Configuring the ACU+ Identification of Rectifiers Checking System Status Checking the System Shutdown CircuitReference Documents Final StepsECO Change Issue Number Description of ChangeFor More Information NetPerform Optimization Services