VERIFYING THE CONFIGURATION FILE

For factory configured systems, your ACU+ was programmed with a configuration file that sets all adjustable parameters. The version number of the configuration file can be found on the configuration drawing (C-drawing) that is supplied with your power system documentation, and on a label located on the ACU+. You can verify that the correct configuration file has been loaded into your ACU+ by performing the following procedure.

Procedure

Note: When viewing any of the following screens, if a key is not depressed within approximately 10 seconds, the ACU+ will automatically return to the Main screen.

1)With the Main screen displayed, press ESC. A screen displays the serial number and software version.

2)Press ENT. A screen displays the hardware version and MAC address.

3)Press ENT. A screen displays the configuration version number.

4)Press ESC, or wait approximately 10 seconds, to return to the Main screen.

CHANGING BATTERY CAPACITY RATING IN THE ACU+

To change the battery capacity setting of the ACU+ to match the battery connected to the power system, perform the following procedure.

Procedure

1)With the Main screen displayed, press ENT to go to the Main Menu. Navigate to and select “Settings” (ENT).

2)If a password screen opens, a password must be entered to allow the User to make adjustments. If a password was previously entered and has not yet timed out, skip this step and proceed to step 3). Otherwise, to enter a password, with the cursor at the User Name field (default is “Admin”), press the down arrow key to move cursor down to the password line. Press ENT. “0” is highlighted. Press the up arrow key once to change the “0” to”1” (default password is “1”), then press ENT twice. (Note: If you have been assigned a unique User Name and password, follow this procedure to enter these.)

3)With the Settings menu screen displayed, navigate to and select “Battery” (ENT) / “Basic” (ENT).

4)Navigate to “Rated Capacity”. Press ENT. Use the up or down keys to adjust the value as required. Press ENT.

Note: For NetSure 4000 Series Battery Tray's, the capacity value is 8.5 A-hr per tray. For customer provided batteries, enter the C10 battery capacity rating in A-hr.

5)Return to the Main screen by repeatedly pressing ESC (escape).

Page 46

Chapter 5. Initially Starting the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 56
Contents Installation Instructions IM584000300 Issue AB, April 3Page Table of Contents Issue AB, April 3 Spec. No Model General Safety Important Safety InstructionsVoltages AC Input Voltages DC Input/Output VoltagesBattery if Equipped Personal Protective Equipment PPE Maintenance and Servicing Procedures Dual Hazardous Input Power SourcesCircuit Card Handling GeneralStatic Warning IM584000300 Bound System Installation Manual Customer Documentation PackageSystem Packaging USB Drive with All Customer DocumentationPower and Control Sub-Rack List 11 Temperature Probes List 98 Part Number QtyGeneral Part Number Qty Rectifiers Part Number QtyDC Load Distribution Sub-Rack List 21, 22, 23 Battery Tray List 91 Recommended Tools and Test Equipment General Installation Acceptance ChecklistChecklist -Factory Integrated System List R1, R2 Checklist Customer Integrated System ship loose Air Flow Air Flow Diagram Installing the SystemGeneral Requirements Inspecting the Equipment Storing for Delayed Installations Storing for Delayed InstallationSecuring the IT Rack to the Floor Inspecting the EquipmentInstalling Individual SUB-RACKS Into Cutomer Installing the Sub-RacksFor customer provided IT rack installation only Customer Supplied IT Rack GuidelinesIM584000300 Electrically Interconnecting the Sub-Racks Mounting DetailsImportant Safety Instructions Wiring Considerations Output Ground ConfigurationsTorque Cable RoutingSub-Rack IM584000300 Removable Panel Hrmg Configurations Only Bus Grounding Connection Tasks to be Performed for Customer Integrated SystemsGrounding Sub-Rack Grounding Frame GroundIssue AB, April 3 Spec. No Model Load Distribution Sub-Rack Battery TrayLoad Distribution Sub-Rack Power and Control Sub-Rack Sub-Racks Electrical Interconnections Sub-Rack Interconnections Making Electrical Connections Power and Control Sub-Rack Battery Tray Conduit Grounding Frame Ground Tasks to be Perform for ALL InstallationsIT Rack Grounding Frame Ground NPG System Grounding Grounding Scheme DiagramHrmg System Grounding Suggested AC Input Power Connections AC Input Power Connections Making Electrical ConnectionsHrmg High Resistance Midpoint Ground Configuration NPG Negative Pole Ground ConfigurationLoad Distribution Sub-Rack Refer to -12as this procedure is performed Battery Manufacturer InformationInstalling Battery Sub-Trays Battery Sub-Trays External Battery Connections if required External Battery Connections Making Electrical Connections Customer Connection To External Battery StringsIB2 ACU+ Controller Interface Board Connections if required Digital Inputs and Programmable Relay OutputsDigital Inputs Programmable Relay OutputsACU+ Controller Ethernet Connection if required Installation Instructions Issue AB, April 3 Spec. No ModelTemperature Probes Power and Control Sub-Rack Programmable J6-5 J6-3 None J6-1 J6-6J6-4 None J6-2 J7-5 J7-3 None J7-1 J7-6Power and Control Chapter Installing the Rectifier Module Initial Startup Preparation Circuit Breaker Locations Initially Starting the System Initially Starting the System Version ***** Starting… ACU+ Controller Local Indicators and Navigation KeysACU+ Controller Initialization IM584000300 Verifying the Configuration File Changing Battery Capacity Rating in the ACU+Checking Basic System Settings Procedure To Select a Sub-MenuTo Enter a Password To Change a ParameterPage Configuring the ACU+ Identification of Rectifiers Checking the System Shutdown Circuit Checking System StatusFinal Steps Reference DocumentsChange Issue Number Description of Change ECONetPerform Optimization Services For More Information