Powerware SOLA 4000 manual ? Does this voltage have positive polarity?

Page 51

SOLA 4000 - Installation and Initial Start-Up

2 Initial Start-Up

B:Inverter Voltage Adjustment • On the SS/FY pcb, measure the voltage at the screws Inverter R, Inverter S, Inverter T with respect to the neutral terminal 5- N.

?Does this voltage correspond to the desired voltage?

no • Adjust the voltage to the desired value individually for each phase using P3, P4 and P5 on the ICT-2 pcb.

NOTE: If the inverter output voltage is changed, the value at TP1 (adjusted with P1) on the ICP pcb should be checked. (6V corresponds to nominal voltage). Note also that for parallel systems, if the voltage is changed here, the current sharing will also be affected. Therefore, change voltage settings ONLY IF ABSOLUTELY NECESSARY. Small variations of the voltage will not affect system performance. The UPS is already pre-calibrated in the factory with nominal load.

yes • Continue with C

C:Inverter free-run frequency check • Insert a pin d=2mm in the red test point S1 on the ICP pcb. The red LED LD3 on the ICP pcb must be permanently lit. The inverter frequency is now free-running without the internal oscillator.

On the SS/FY pcb, measure the inverter frequency on the screws Inverter R, S or T with respect to neutral.

Check that the frequency is set at the required value (50/60 Hz +/- 0,1 Hz). It can be adjusted with P1 on the ICT-2 pcb. Re- move the pin from S1. The inverter now synchronises with the internal oscillator.

Make sure that the batteries have been installed according to the instructions for installation.

With an external battery cabinet B3/38:

Measure the battery voltage in the battery cabinet at the battery switch between cables:

--290 (-) and -1 (+)

-+1 (-) and +4 (+)

With an external battery cabinet B3/65:

Measure the battery voltage in the battery cabinet at the battery switch between cables:

--290 (-) and -1 (+)

-+1 (-) and +2 (+)

?Does this voltage have positive polarity?

no • Open IRP, wait for 5-10 minutes, and then reconnect the battery cables at the terminals which lead to the switch(es) where the wrong polarity was detected.

• Return to D.

yes • Check the voltage between the battery terminals B+ and B-.

The value of this voltage should be already set according to the amount of batteries installed.

• Close battery switch IB.

The alarm "battery switch open" stops.

JUE 401265

51

Image 51
Contents Uninterruptible Power Supply Sola 4000 Operating Manual Safety Instructions Safety InstructionsSola 4000 Operating Manual Safety Instructions Sola 4000 General System Description Chapters UPS AssemblyUPS Assembly FeaturesSola 4000 General System Description UPS System Structure Rectifier/Battery ChargerBattery Accumulator Static SwitchesInverter Under inverter failure conditions Hot-Standby Systems Maintenance BypassParallel Systems Parallel-Redundant SystemsRemote Monitoring Emergency Power OffOperating Panel Functional DescriptionInitial START- UP Sola 4000 Installation and Initial Start-Up ChaptersFiguresInstallation Additional START- UP Procedure for MULTI-UNIT SYSTEMS42Sola 4000 Installation and Initial Start-Up Sola 4000 Installation and Initial Start-UpMechanical Installation InstallationFloor Space Required Weight6 UPS 10-60kVA room size JUE Room Size for 10-60 kVA UPS7 UPS 80-120kVA room size JUE Room Size for 80-120 kVA UPS with auxiliary AC001 cabinet8 UPS 80-120kVA room size JUE Room Size for 80-120 kVA UPS with auxiliary AC002 cabinetGeneral Electrical Installation1 UPS connection diagram, version Mm² Input Cables / Fuses2 UPS connection diagram, version Output / Battery Cables Input CablesInput Fuses Sola 4000 with isolation transformer of the bypass supply Installation of additional optional cabi- netsSola 4000 with THD filters 3 UPS connection diagram, with THD filtersSola 4000 with 12-pulse charger / rectifier 4 Installation of 12-pulse units without galvanic isolation1 External Maintenance Bypass Switch Version 1 2 position Installation of an External Maintenance Bypass2 External Maintenance Bypass Switch Version 2 3 position Installation Cpnet Interface CardFunctions MOK 1 Connection of Remote EPO with N.C. contact Remote Emergency Power offDiesel Generator Operation Remote Reset Common Alarm ContactsInstallation of Hot-Standby Systems Installation Installation of the Interconnection Cable Installation of Parallel Systems Installation Installation 11.3 Location of connectors on the IBYBP-CP pcb Installation of the Interconnection CablesBattery Installation Internal Electrical Connections 12.1 Internal Battery connections12.3 B3/38 battery trays in the second and the third level Installation of External BatteriesInstallation 12.6 B3/38 internal electrical connections 12.7 Battery cabinet B3/65 12.9 B3/65 internal electrical connections Connection of Auxiliary Contacts Connection Between UPS and Additional Battery CabinetsStart-Up Procedure Initial Start-UpInitial START-UP ? Does this voltage have positive polarity? OK? Check Static Switch Commutation CheckBattery Charging Current Limitation YesStart-Up Procedure for Hot -standby Sys- tems Additional Start-Up Proced. for Multi-Unit SystemsAdditional START-UP PROCED. for MULTI-UNIT Systems Start-Up Procedure for Parallel Systems System START-UP has NOW Been Successfully Completed Sola 4000 Operation Chapters General Operating ModesSola 4000 Operation Operating ModesLED Indication Normal Operation Battery OperationOperating Modes Stand-alone Unit Operating Modes STAND-ALONE UnitMaintenance Bypass Operation Bypass OperationStandby Operation Operating Modes Hot-Standby Operation Operating Modes HOT-STANDBY OperationOperation with an Inverter Failure Operating Modes Hot-Standby Operation Partial Load Operation Operating Modes Parallel and Parallel/Redundant OperationOperating Modes Parallel and Parallel/Redundant Operation Operating Modes Parallel and Parallel/Redundant Operation Operating Steps Switching On the UPS System / from Maintenance BypassInitial UPS Operating Mode Operating InstructionsFinal UPS Operating Mode CPHC16-S Switching Off the UPS System / to Main- tenance BypassIPR IPRS1 ICPPB2 IRE IUG IRP Emergency Shut Down Reset after Activating E.P.OTables Sola 4000 Operating Panel ChaptersIndication of Important Data Battery MonitoringFunctions Sola 4000 Operating PanelAlarm signalling UPS Operating Mode IndicationEmergency Power Off LED Indication LED IndicationLED 4 Battery Discharging LED 28 E.P.O LEDs Battery IndicatorLED 30 Boost Charge Communication with a PC Communication with a PCConnection to PC Service Mode Snmp ModeAlarms IUG monitoring failure Static switch failure SSIStatic switch failure SSB Oscillator failureMetering UPS statusDIP Switch Settings Panel SettingsTAB 4.4 Setting of SW2 Location of DIP-switches and pushbuttons on the CPU/NCP pcb Remote Panel InstallationUPS =1...8 identifies the UPS FunctionsUPSx Followed by DIP-switch settingsUPS Control Logic Sola 4000 PCB Description ChaptersUPS Control Logic Sola 4000 PCB DescriptionUPS Control Logic IF/PS R Front View RectifierCPHC16 R Front View Reset MAX. VdcInverter ICP Front View ResetTP5 ICT-2 Front ViewIPS-500 Front View IPR front view Bypass IF/PS S Front View Bypass CPHC16 S Front ViewRectifier Data Sola 4000 Technical DataBattery Data System DataSystem Data Sola 4000 Technical DataRectifier Data Battery Data Battery DataInverter Data Inverter Data