SOLA 4000 - Installation and Initial Start-Up
1 Installation
Important: Open battery switch IB before connecting the cables.
•Place the trays with the batteries on the correspond- ing levels in the UPS.
•Connect the battery blocks of the various levels to the battery switch IB, and IB to the terminals, as shown in FIG. 1.12.5 and FIG. 1.12.6
Ensure appropriate ventilation of the battery room according to the standard
JUE 401265 | 45 |