Section 3
Running Mail
Checklist Before Running Mail
Before you run mail on your digital postage meter, review these items:
•Make sure your postage meter is plugged into a properly ground- ed, 110 VAC receptacle. Always follow the safety precautions listed in Section 1- Introduction.
•Check that you have enough postage for your mail run. Press Funds to view your current balance.
•Check that you have a spare ink cartridge if you are low on ink and need to run a large number of mail pieces. See Section 11 - Supplies and Options for ordering additional ink cartridges.
•If you plan to apply postage on large or thick pieces and parcels that can't be run through the machine, use the optional tape sheets. See Section 11 - Supplies and Options for part numbers of tape sheets. Insert the tape sheets in the machine just like a normal mail piece. Apply the tape sheet on the mail piece or par- cel in the upper
•When you power up your postage meter, the main screen ap- pears on the display. If your postage meter has been set up to require a lock code or password, you are prompted to enter it. A typical main screen is show below (with optional scale con- nected):
$0.50 | 0 g |
Dom Ltr Std | 06/16 |
SV61503 Rev. A |