Time requirements 11
•"CallPilot resource configuration" (page 17)
•"CallPilot server preinstallation" (page 37)
•"CallPilot server installation" (page 41)
•"CallPilot server configuration" (page 47)
•"CallPilot server testing" (page 55)
Time requirements
The following table shows the approximate time required to complete each task in the work flow.
Table 1
Time requirements
Task | Time to completion |
|
|
CS 1000/M1 system status check | 15 minutes |
|
|
CallPilot resource configuration | 2 hours |
|
|
CallPilot server preinstallation | 1 hour |
|
|
CallPilot server installation | 1 hour |
|
|
CallPilot server configuration | 2 hours |
|
|
CallPilot server testing | 1.5 hours |
|
|
Total time to completion = | 7 hours 45 minutes |
|
|
Nortel CallPilot
Quickstart Guide
5.019 May 2008
Copyright ©