3.4. Battery Connections

WARNING: Hazardous energy levels are present on bare conductors in the dc distribution connection area of the plant. Accidental shorting of distribution conductors can cause arcing and high currents that can cause serious burns or other physical harm. It is recommended that:

Remove any jewelry, rings or watches while working on this equipment.

Use insulated wrenches, screwdrivers, cutters, pliers and other tools.

Planning the Battery installation

The battery cable(s) should be sized to limit the voltage drop from the dc power plant to the battery during charging per system design requirements. The cable(s) must also carry the full load current during battery operation. If assistance is required to determine the necessary cables for the application, contact your sales representative or APC (Refer to Section 10 for APC Customer Support information. A fuse or circuit breaker (various options are available from APC) is recommended in the negative line to protect the cables from the battery to the dc power plant. If a circuit breaker is used, the power plant can monitor auxiliary contacts from this breaker.

Connecting the Cables

WARNING: Make certain that the battery polarity is correct when making connections to the dc power plant. Incorrect connection could cause severe equipment damage.

The battery cable connections are located at the rear of the unit as shown in Figure 3.4-1. The battery positive and battery negative buses each provide a pair of #10-32 studs on 5/8” centers for connecting two-hole battery cable lugs. A ring size of 6 mm may also be used. Connect the battery cables as applicable using #10-32 nuts. Cover connections with heat shrink after assembly.

Magnum VS –48 Vdc User’s Manual

Page 7

Image 12
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Revision History Document # & Rev Date DescriptionSafety First General PrecautionsHow to Use This Manual IntroductionGeneral Information Amp System Only Installation Mechanical InstallationUnpacking Equipment Room / LocationAC Power Connections VentilationAC Connections AC Power Cord Sets AWGBattery Connections Planning the Battery installationConnecting the Cables Battery Temperature Probe Installation 1 Battery Cable Connection LocationsCounter Electro-Motive Force Cemf Cell Connections DC System GroundingLoad Protection Installation Circuit Breaker InstallationGMT Fuse Installation Load Connections Cable Size ConsiderationsCircuit Breaker Protected Load Connections 30 or 60 a GMT Fuse protected Load ConnectionsRJ45 Ethernet Connector Monitoring and Relay Output ConnectionsFront Panel DB9 Connection Major, Minor and Relay 1 Output ConnectionsOutput Relay 2-6 Connections Relay Terminal Relay Alias Output Relay Notes DesignationsRectifier Module Installation External Alarm Input ConnectionsController Module Installation Electrical Installation Battery Visual and Safety InspectionCommissioning Pre-Commissioning InspectionAC Power Up DC Power UpCommissioning Initial Set-upBattery Power Up Rectifier TestLVD Test Circuit Breaker/ Fuse TestBattery Temperature Compensation Final InspectionOutput Relay Technical Description Rectifier ManagementSystem Management System Status and Alarm Reporting Load ManagementSystem Current Monitor Circuit BreakersBattery Management Battery ChargingGMT Fuses Battery Equalization Battery ProtectionBattery Temperature Monitoring Battery Low Voltage Disconnect Battery Functional TestCounter Electro-Motive Force Module Connections Controls and Indicators Alarm Outputs Output RelaysController with Display Controller without DisplayExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringOperation DescriptionController Card Jumpers Controller with Display J12 J13Operation using Local Display and Keypad Interface 1 Controller with Display设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Operation Using the RS-232 Comm Port Controller without DisplayOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay LVD Operation System/PreferencesProgramming Output Relays Page Preventive Maintenance System Visual and Safety InspectionEquipment InspectionRectifier Alarm Test TestSystem Voltage Test Rectifier Current Share TestSystem Temperature Test Battery Current TestBattery Temperature Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor Specifications Magnum VS 50 Power SystemAC Input TWF0500H54B RectifierMagnum VS 100 Power System DC OutputMagnum VS 50 Power System Mechanical Magnum VS ControllerEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty