APC
VS 50, VS 100
user manual
Magnum VS Vdc Power Systems User’s Manual
Specs
Install
Alarm Outputs Output Relays
Connecting the Cables
Warranty
Maintenance
RJ45 Ethernet Connector
Battery Power Up
System Temperature Test
How to
Page 1
Magnum VS 50
Magnum VS 100
-48
Vdc Power Systems
User’s Manual
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
Magnum VS Vdc Power Systems User’s Manual
Table of Contents
Final Inspection
TWF0500H54B Rectifier Magnum VS Controller
Document # & Rev Date Description
Revision History
General Precautions
Safety First
Introduction
How to Use This Manual
General Information
Amp System Only
Mechanical Installation
Installation
Unpacking Equipment
Room / Location
Ventilation
AC Power Connections
AC Connections
AWG
AC Power Cord Sets
Planning the Battery installation
Battery Connections
Connecting the Cables
1 Battery Cable Connection Locations
Battery Temperature Probe Installation
DC System Grounding
Counter Electro-Motive Force Cemf Cell Connections
Circuit Breaker Installation
Load Protection Installation
GMT Fuse Installation
Cable Size Considerations
Load Connections
Circuit Breaker Protected Load Connections 30 or 60 a
GMT Fuse protected Load Connections
Monitoring and Relay Output Connections
RJ45 Ethernet Connector
Front Panel DB9 Connection
Major, Minor and Relay 1 Output Connections
Relay Terminal Relay Alias Output Relay Notes Designations
Output Relay 2-6 Connections
External Alarm Input Connections
Rectifier Module Installation
Controller Module Installation
Battery Visual and Safety Inspection
Electrical Installation
Commissioning
Pre-Commissioning Inspection
DC Power Up
AC Power Up
Commissioning
Initial Set-up
Rectifier Test
Battery Power Up
LVD Test
Circuit Breaker/ Fuse Test
Final Inspection
Battery Temperature Compensation
Output Relay
Rectifier Management
Technical Description
System Management
Load Management
System Status and Alarm Reporting
System Current Monitor
Circuit Breakers
Battery Charging
Battery Management
GMT Fuses
Battery Protection
Battery Equalization
Battery Temperature Monitoring
Battery Functional Test
Battery Low Voltage Disconnect
Counter Electro-Motive Force Module Connections
Alarm Outputs Output Relays
Controls and Indicators
Controller with Display
Controller without Display
Network Management Card Local & Remote Monitoring
External Alarm Inputs User Input
Description
Operation
Controller Card Jumpers
J12 J13
Controller with Display
1 Controller with Display
Operation using Local Display and Keypad Interface
设置 / 电池 / 容量
设置 / 系统 / 时/日
均充 / 均充时间
状态 / 系统 /参数
Alarms
均充时间
Controller without Display
Operation Using the RS-232 Comm Port
Operation Using the 10/100 BaseT Ethernet Port
1 Parameter Locations, Descriptions, and Settings
ON, OFF
Power Modules/Rectifiers
Seconds
Disable
Output Relay
System/Preferences
LVD Operation
Programming Output Relays
Page
System Visual and Safety Inspection
Preventive Maintenance
Equipment
Inspection
Test
Rectifier Alarm Test
System Voltage Test
Rectifier Current Share Test
Battery Current Test
System Temperature Test
Battery Temperature Test
Battery Preventive Maintenance Procedure
Alarm Summary
System LT Alm System Temperature is below Minor
Magnum VS 50 Power System
Specifications
AC Input
TWF0500H54B Rectifier
DC Output
Magnum VS 100 Power System
Magnum VS 50 Power System
Magnum VS Controller
Mechanical
Environmental
EMC
Compliance
APC Worldwide Customer Support
Limited Product Warranty
Related pages
All Power page
Power Supply for SEAL 6500
Power Control for Samsung LH85QMDRTBC/EN
Power-Saving Tips for Motorola ML910
Powering Up for Honeywell DCP200
Check the Power Adapter for Aspire Digital 8735ZG
If the Power Goes OUT for Cortelco 2220
VCR Line Input POWER/MODE for Samsung VP-M2050S/XEV
Adjacent Channel Power Measurement for Anritsu Series MS278XB
Power Source and Frame Rate for Nikon D800EFXBODY
Auxiliary Power for Lincoln Electric IM856
What operating systems are compatible with the Motorola SM56 modem?
Discover compatibility here
Top
Page
Image
Contents