APC VS 100, VS 50 user manual Final Inspection, Output Relay, Battery Temperature Compensation

Page 24

Output Relay 1:

1.Minor and Major output relays were tested in the rectifier test section.

2.Change the alarm to desired relay output via the controller for any relay output that will be used. All alarm parameters are shipped as either major or minor, but may be changed to output relay 1.

3.Program output relay 1 to desired major or minor alarm to complete programming.

4.Exercise the output relay by causing the alarm to change state.

Battery Temperature Compensation

1.Enable battery temperature compensation if desired.

2.Ensure that battery temperature probe is connected to the system and attached to the battery.

3.Verify that the system voltage is above the float voltage setting if the battery temperature is below 25 degrees C and below the float voltage setting if the battery temperature is above 25 degrees C.

4.3.Final Inspection:

1.Verify that the interior and exterior of the system is clean and free from debris.

2.Ensure all wires connected and bolts are properly tightened.

3.Ensure the following the User, Service, and Calibration parameters are set properly on the controller:

LVD

LVD1 Trip LVD1 Reset

Battery Parameters Discharge Threshold Float Voltage Maximum Recharge Compensation Method

4.Verify that the system is functioning correctly with no alarms.

Be sure to leave the site as orderly and neat as possible.

Magnum VS –48 Vdc User’s Manual

Page 19

Image 24
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Revision History Document # & Rev Date DescriptionSafety First General PrecautionsHow to Use This Manual IntroductionGeneral Information Amp System Only Installation Mechanical InstallationUnpacking Equipment Room / LocationAC Power Connections VentilationAC Connections AC Power Cord Sets AWGBattery Connections Planning the Battery installationConnecting the Cables Battery Temperature Probe Installation 1 Battery Cable Connection LocationsCounter Electro-Motive Force Cemf Cell Connections DC System GroundingLoad Protection Installation Circuit Breaker InstallationGMT Fuse Installation Load Connections Cable Size ConsiderationsCircuit Breaker Protected Load Connections 30 or 60 a GMT Fuse protected Load ConnectionsRJ45 Ethernet Connector Monitoring and Relay Output ConnectionsFront Panel DB9 Connection Major, Minor and Relay 1 Output ConnectionsOutput Relay 2-6 Connections Relay Terminal Relay Alias Output Relay Notes DesignationsRectifier Module Installation External Alarm Input ConnectionsController Module Installation Electrical Installation Battery Visual and Safety InspectionCommissioning Pre-Commissioning InspectionAC Power Up DC Power UpCommissioning Initial Set-upBattery Power Up Rectifier TestLVD Test Circuit Breaker/ Fuse TestBattery Temperature Compensation Final InspectionOutput Relay Technical Description Rectifier ManagementSystem Management System Status and Alarm Reporting Load ManagementSystem Current Monitor Circuit BreakersBattery Management Battery ChargingGMT Fuses Battery Equalization Battery ProtectionBattery Temperature Monitoring Battery Low Voltage Disconnect Battery Functional TestCounter Electro-Motive Force Module Connections Controls and Indicators Alarm Outputs Output RelaysController with Display Controller without DisplayExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringOperation DescriptionController Card Jumpers Controller with Display J12 J13Operation using Local Display and Keypad Interface 1 Controller with Display设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Operation Using the RS-232 Comm Port Controller without DisplayOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay LVD Operation System/PreferencesProgramming Output Relays Page Preventive Maintenance System Visual and Safety InspectionEquipment InspectionRectifier Alarm Test TestSystem Voltage Test Rectifier Current Share TestSystem Temperature Test Battery Current TestBattery Temperature Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor Specifications Magnum VS 50 Power SystemAC Input TWF0500H54B RectifierMagnum VS 100 Power System DC OutputMagnum VS 50 Power System Mechanical Magnum VS ControllerEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty