2)Slide the rectifier module into the shelf between the guides until it is fully seated.

3)Fasten the rectifier in place with the captive rectifier retaining screws.

Since all adjustments are made from the system controller, no rectifier adjustments are necessary.

3.11. Controller Module Installation

CAUTION: The controller and the network management card have lithium batteries. These batteries are not field serviceable.

Danger of explosion if battery is replaced by an incorrect type.

Dispose of used batteries according to the manufacturer’s instructions.

The controller is installed in the Magnum VS 50 in the right hand side of the power system. The controller is installed in the Magnum VS 100 in the upper right hand side of the power system. Insert the card taking care to follow the alignment guides all the way to the rear of the unit. The connector on the rear will hot plug into the power system backplane.

To install the controller with display, first remove rectifier number 5, which is in the slot nearest the controller. Insert the card taking care to follow the alignment guides all the way to the rear of the unit. The connector on the rear will hot plug into the power system backplane. Removing the rectifier will decrease the total output capacity of the power system.

Magnum VS –48 Vdc User’s Manual

Page 15

Image 20
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Revision History Document # & Rev Date DescriptionSafety First General PrecautionsGeneral Information How to Use This ManualIntroduction Amp System Only Installation Mechanical InstallationUnpacking Equipment Room / LocationAC Connections AC Power ConnectionsVentilation AC Power Cord Sets AWGConnecting the Cables Battery ConnectionsPlanning the Battery installation Battery Temperature Probe Installation 1 Battery Cable Connection LocationsCounter Electro-Motive Force Cemf Cell Connections DC System GroundingGMT Fuse Installation Load Protection InstallationCircuit Breaker Installation Load Connections Cable Size ConsiderationsCircuit Breaker Protected Load Connections 30 or 60 a GMT Fuse protected Load ConnectionsRJ45 Ethernet Connector Monitoring and Relay Output ConnectionsFront Panel DB9 Connection Major, Minor and Relay 1 Output ConnectionsOutput Relay 2-6 Connections Relay Terminal Relay Alias Output Relay Notes DesignationsRectifier Module Installation External Alarm Input ConnectionsController Module Installation Electrical Installation Battery Visual and Safety InspectionCommissioning Pre-Commissioning InspectionAC Power Up DC Power UpCommissioning Initial Set-upBattery Power Up Rectifier TestLVD Test Circuit Breaker/ Fuse TestOutput Relay Battery Temperature CompensationFinal Inspection System Management Technical DescriptionRectifier Management System Status and Alarm Reporting Load ManagementSystem Current Monitor Circuit BreakersGMT Fuses Battery ManagementBattery Charging Battery Temperature Monitoring Battery EqualizationBattery Protection Counter Electro-Motive Force Module Connections Battery Low Voltage DisconnectBattery Functional Test Controls and Indicators Alarm Outputs Output RelaysController with Display Controller without DisplayExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringController Card Jumpers OperationDescription Controller with Display J12 J13Operation using Local Display and Keypad Interface 1 Controller with Display设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Operation Using the RS-232 Comm Port Controller without DisplayOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay LVD Operation System/PreferencesProgramming Output Relays Page Preventive Maintenance System Visual and Safety InspectionEquipment InspectionRectifier Alarm Test TestSystem Voltage Test Rectifier Current Share TestBattery Temperature Test System Temperature TestBattery Current Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor Specifications Magnum VS 50 Power SystemAC Input TWF0500H54B RectifierMagnum VS 100 Power System DC OutputMagnum VS 50 Power System Mechanical Magnum VS ControllerEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty