APC VS 100, VS 50 user manual AC Power Connections, Ventilation, AC Connections

Page 10

Ventilation

The rectifier modules for this system have fans that provide front-to-rear airflow for internal cooling. The power system housing should be mounted such that there is free airflow to the front and back of the unit. [Refer to Section 9.5 for environmental characteristics.] Free airflow should be ensured so that the power system can provide full power without de-rating.

3.3. AC Power Connections

WARNING: Ensure that all of the external dc and ac circuit breakers are in the OFF position prior to connecting service to the power plant. Confirm that all voltages have been removed including any battery sources before proceeding.

AC Connections

The dc power system requires the supply of 85 – 264 Vac, 47 – 63 Hz single phase power. One alternating current (ac) input on the power system backplane supplies power to the first rectifier in each shelf. Two inputs supply power to the second and third pair of rectifiers and the fourth and fifth pair in each shelf. This scheme allows a variety of wiring options. Provided the input wiring is not overloaded, one, two or all three inputs on each shelf can be jumpered together. The ambient temperature and number of wires in a conduit must be considered in accordance with NEC and local requirements. The power system typically ships with the jumpers shown in the backplane layout of the Magnum VS 50 shown in Figure 3.3-1. The Magnum VS 100 contains two identical backplanes. The input terminals are defined in Figure 3.3-3. If one ac input cable is used it is typically connected to TRM10, 7 and 4.

Figure 3.3-1 Magnum VS 50 Backplane

Magnum VS –48 Vdc User’s Manual

Page 5

Image 10
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Revision History Document # & Rev Date DescriptionSafety First General PrecautionsIntroduction How to Use This ManualGeneral Information Amp System Only Unpacking Equipment InstallationMechanical Installation Room / LocationVentilation AC Power ConnectionsAC Connections AC Power Cord Sets AWGPlanning the Battery installation Battery ConnectionsConnecting the Cables Battery Temperature Probe Installation 1 Battery Cable Connection LocationsCounter Electro-Motive Force Cemf Cell Connections DC System GroundingCircuit Breaker Installation Load Protection InstallationGMT Fuse Installation Circuit Breaker Protected Load Connections 30 or 60 a Load ConnectionsCable Size Considerations GMT Fuse protected Load ConnectionsFront Panel DB9 Connection RJ45 Ethernet ConnectorMonitoring and Relay Output Connections Major, Minor and Relay 1 Output ConnectionsOutput Relay 2-6 Connections Relay Terminal Relay Alias Output Relay Notes DesignationsRectifier Module Installation External Alarm Input ConnectionsController Module Installation Commissioning Electrical InstallationBattery Visual and Safety Inspection Pre-Commissioning InspectionCommissioning AC Power UpDC Power Up Initial Set-upLVD Test Battery Power UpRectifier Test Circuit Breaker/ Fuse TestFinal Inspection Battery Temperature CompensationOutput Relay Rectifier Management Technical DescriptionSystem Management System Current Monitor System Status and Alarm ReportingLoad Management Circuit BreakersBattery Charging Battery ManagementGMT Fuses Battery Protection Battery EqualizationBattery Temperature Monitoring Battery Functional Test Battery Low Voltage DisconnectCounter Electro-Motive Force Module Connections Controller with Display Controls and IndicatorsAlarm Outputs Output Relays Controller without DisplayExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringDescription OperationController Card Jumpers Controller with Display J12 J13Operation using Local Display and Keypad Interface 1 Controller with Display设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Operation Using the RS-232 Comm Port Controller without DisplayOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay LVD Operation System/PreferencesProgramming Output Relays Page Equipment Preventive MaintenanceSystem Visual and Safety Inspection InspectionSystem Voltage Test Rectifier Alarm TestTest Rectifier Current Share TestBattery Current Test System Temperature TestBattery Temperature Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor AC Input SpecificationsMagnum VS 50 Power System TWF0500H54B RectifierMagnum VS 100 Power System DC OutputMagnum VS 50 Power System Mechanical Magnum VS ControllerEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty