APC VS 100, VS 50 user manual Table of Contents

Page 2

 

 

Table of Contents

 

1

Safety First!

1

 

1.1.

WARNING SYMBOLS

1

 

1.2.

GENERAL PRECAUTIONS:

1

2

Introduction

2

 

2.1.

GENERAL INFORMATION

2

 

2.2.

HOW TO USE THIS MANUAL

2

3

Installation

4

 

3.1.

UNPACKING EQUIPMENT

4

 

3.2.

MECHANICAL INSTALLATION

4

 

Room / Location

4

 

Mounting

4

 

Ventilation

5

 

3.3.

AC POWER CONNECTIONS

5

 

AC Connections

5

 

AC Power Cord Sets

6

 

3.4.

BATTERY CONNECTIONS

7

 

Planning the Battery installation

7

 

Connecting the Cables

7

 

Battery Temperature Probe Installation

8

 

3.5.

COUNTER ELECTRO-MOTIVEFORCE (CEMF) CELL CONNECTIONS

9

 

3.6.

DC SYSTEM GROUNDING

9

 

3.7.

LOAD PROTECTION INSTALLATION

10

 

Circuit Breaker Installation

10

 

GMT Fuse Installation

10

 

3.8.

LOAD CONNECTIONS

11

 

Cable Size Considerations

11

 

Circuit Breaker Protected Load Connections (30 or 60 A)

11

 

GMT Fuse protected Load Connections

11

 

3.9.

MONITORING AND RELAY OUTPUT CONNECTIONS

12

 

Front Panel DB9 Connection

12

 

RJ45 Ethernet Connector

12

 

Major, Minor and Relay 1 Output Connections

12

 

Output Relay 2-6 Connections

13

 

External Alarm Input Connections

14

 

3.10.

RECTIFIER MODULE INSTALLATION

14

 

3.11.

CONTROLLER MODULE INSTALLATION

15

4

Commissioning

16

 

4.1.

PRE-COMMISSIONINGINSPECTION

16

 

Environment

16

 

Electrical Installation

16

 

Battery Visual and Safety Inspection

16

 

4.2.

COMMISSIONING

17

 

Initial Set-up

17

Magnum VS –48 Vdc User’s Manual

Page ii

Image 2
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Revision History Document # & Rev Date DescriptionSafety First General PrecautionsGeneral Information How to Use This ManualIntroduction Amp System Only Unpacking Equipment InstallationMechanical Installation Room / LocationAC Connections AC Power ConnectionsVentilation AC Power Cord Sets AWGConnecting the Cables Battery ConnectionsPlanning the Battery installation Battery Temperature Probe Installation 1 Battery Cable Connection LocationsCounter Electro-Motive Force Cemf Cell Connections DC System GroundingGMT Fuse Installation Load Protection InstallationCircuit Breaker Installation Circuit Breaker Protected Load Connections 30 or 60 a Load ConnectionsCable Size Considerations GMT Fuse protected Load ConnectionsFront Panel DB9 Connection RJ45 Ethernet ConnectorMonitoring and Relay Output Connections Major, Minor and Relay 1 Output ConnectionsOutput Relay 2-6 Connections Relay Terminal Relay Alias Output Relay Notes DesignationsRectifier Module Installation External Alarm Input ConnectionsController Module Installation Commissioning Electrical InstallationBattery Visual and Safety Inspection Pre-Commissioning InspectionCommissioning AC Power UpDC Power Up Initial Set-upLVD Test Battery Power UpRectifier Test Circuit Breaker/ Fuse TestOutput Relay Battery Temperature CompensationFinal Inspection System Management Technical DescriptionRectifier Management System Current Monitor System Status and Alarm ReportingLoad Management Circuit BreakersGMT Fuses Battery ManagementBattery Charging Battery Temperature Monitoring Battery EqualizationBattery Protection Counter Electro-Motive Force Module Connections Battery Low Voltage DisconnectBattery Functional Test Controller with Display Controls and IndicatorsAlarm Outputs Output Relays Controller without DisplayExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringController Card Jumpers OperationDescription Controller with Display J12 J13Operation using Local Display and Keypad Interface 1 Controller with Display设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Operation Using the RS-232 Comm Port Controller without DisplayOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay LVD Operation System/PreferencesProgramming Output Relays Page Equipment Preventive MaintenanceSystem Visual and Safety Inspection InspectionSystem Voltage Test Rectifier Alarm TestTest Rectifier Current Share TestBattery Temperature Test System Temperature TestBattery Current Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor AC Input SpecificationsMagnum VS 50 Power System TWF0500H54B RectifierMagnum VS 100 Power System DC OutputMagnum VS 50 Power System Mechanical Magnum VS ControllerEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty