3.1. Unpacking Equipment

Remove equipment from packing material and inspect for shipping damage or missing items. It is important to report damage or material shortages to the shipping carrier while a representative is on site.

If concealed damage or material shortages are found at a later time, contact the shipper to make arrangements for inspection and claim filing. Refer to Section 10 in the event it is necessary to return equipment to APC.

CAUTION: Appropriate lifting techniques and safety equipment should be used to remove equipment from packing.

PLEASE RECYCLE: The shipping materials can be recycled. Please save them for later use or dispose accordingly.

3.2. Mechanical Installation

Room / Location

NOTE: The APC dc power plant is to be installed in a room, vault, or similar enclosure that is accessible only to qualified persons in accordance with the regulatory authority having jurisdiction.

Prior to installation, drawings, floor loading requirements, external alarm points, ac service entrance, and grounding schemes should all be checked and confirmed. If batteries are to be mounted in a room separate from the power plant, careful attention should be paid to battery cable voltage drop effects. Environmental operating temperatures and ventilation/cooling considerations should also be noted, not just for the power system but also for all other equipment that may reside in the power room area.

Mounting

The Magnum VS provides brackets to mount on a standard EIA 19 or 23-inch rack. Install the power system using hardware designed for the rack. To install a Magnum VS 50 on a 23-inch rack use bracket kit number 0M-2829. To install a Magnum VS 100 on a 23-inch rack use bracket kit number 0M-2830.

Magnum VS –48 Vdc User’s Manual

Page 4

Image 9
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Document # & Rev Date Description Revision HistoryGeneral Precautions Safety FirstHow to Use This Manual IntroductionGeneral Information Amp System Only Mechanical Installation InstallationUnpacking Equipment Room / LocationAC Power Connections VentilationAC Connections AWG AC Power Cord SetsBattery Connections Planning the Battery installationConnecting the Cables 1 Battery Cable Connection Locations Battery Temperature Probe InstallationDC System Grounding Counter Electro-Motive Force Cemf Cell ConnectionsLoad Protection Installation Circuit Breaker InstallationGMT Fuse Installation Cable Size Considerations Load ConnectionsCircuit Breaker Protected Load Connections 30 or 60 a GMT Fuse protected Load ConnectionsMonitoring and Relay Output Connections RJ45 Ethernet ConnectorFront Panel DB9 Connection Major, Minor and Relay 1 Output ConnectionsRelay Terminal Relay Alias Output Relay Notes Designations Output Relay 2-6 ConnectionsExternal Alarm Input Connections Rectifier Module InstallationController Module Installation Battery Visual and Safety Inspection Electrical InstallationCommissioning Pre-Commissioning InspectionDC Power Up AC Power UpCommissioning Initial Set-upRectifier Test Battery Power UpLVD Test Circuit Breaker/ Fuse TestBattery Temperature Compensation Final InspectionOutput Relay Technical Description Rectifier ManagementSystem Management Load Management System Status and Alarm ReportingSystem Current Monitor Circuit BreakersBattery Management Battery ChargingGMT Fuses Battery Equalization Battery ProtectionBattery Temperature Monitoring Battery Low Voltage Disconnect Battery Functional TestCounter Electro-Motive Force Module Connections Alarm Outputs Output Relays Controls and IndicatorsController with Display Controller without DisplayNetwork Management Card Local & Remote Monitoring External Alarm Inputs User InputOperation DescriptionController Card Jumpers J12 J13 Controller with Display1 Controller with Display Operation using Local Display and Keypad Interface设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Controller without Display Operation Using the RS-232 Comm PortOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay System/Preferences LVD OperationProgramming Output Relays Page System Visual and Safety Inspection Preventive MaintenanceEquipment InspectionTest Rectifier Alarm TestSystem Voltage Test Rectifier Current Share TestSystem Temperature Test Battery Current TestBattery Temperature Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor Magnum VS 50 Power System SpecificationsAC Input TWF0500H54B RectifierDC Output Magnum VS 100 Power SystemMagnum VS 50 Power System Magnum VS Controller MechanicalEnvironmental EMC ComplianceAPC Worldwide Customer Support Limited Product Warranty