APC VS 100, VS 50 user manual TWF0500H54B Rectifier Magnum VS Controller

Page 4

6.5.

CONTROLLER WITHOUT DISPLAY

36

6.6.

OPERATION USING THE RS-232 COMM PORT

36

6.7.

OPERATION USING THE 10/100 BASET ETHERNET PORT

37

6.8.

OPERATION USING NETWORK MANAGEMENT CARD WEB BROWSER INTERFACE

37

6.9.

LVD OPERATION

44

6.10.

PROGRAMMING OUTPUT RELAYS

45

7

Preventive Maintenance

47

7.1.

EQUIPMENT

47

7.2.

INSPECTION

47

 

Environmental Inspection

47

 

System Visual and Safety Inspection

47

 

Battery Visual and Safety Inspection

48

7.3.

TEST

48

 

System Voltage Test

48

 

Rectifier Current Share Test

48

 

System Current Test

48

 

Rectifier Alarm Test

48

 

System Temperature Test

49

 

Battery Current Test

49

 

Battery Temperature Test

49

 

LVD Test

49

 

Battery Preventive Maintenance Procedure

50

7.4.

FINAL INSPECTION:

50

8

Alarm Summary

51

9

Specifications

53

9.1.

AC INPUT

53

 

TWF0500H54B Rectifier

53

 

Magnum VS 50 Power System

53

 

Magnum VS 100 Power System

54

9.2.

DC OUTPUT

54

 

TWF0500H54B Rectifier

54

 

Magnum VS 50 Power System

55

 

Magnum VS 100 Power System

55

9.3.

CONTROLS AND INDICATORS

56

 

TWF0500H54B Rectifier

56

 

Magnum VS Controller

56

9.4.

MECHANICAL

56

 

TWF0500H54B Rectifier

56

 

Magnum VS 50 Power System

56

 

Magnum VS 100 Power System

57

9.5.

ENVIRONMENTAL

57

9.6.

COMPLIANCE

58

10 APC Worldwide Customer Support

59

11

Limited Product Warranty

60

Magnum VS –48 Vdc User’s Manual

Page iv

Image 4
Contents Magnum VS Vdc Power Systems User’s Manual Table of Contents Final Inspection TWF0500H54B Rectifier Magnum VS Controller Revision History Document # & Rev Date DescriptionSafety First General PrecautionsIntroduction How to Use This ManualGeneral Information Amp System Only Installation Mechanical InstallationUnpacking Equipment Room / LocationVentilation AC Power ConnectionsAC Connections AC Power Cord Sets AWGPlanning the Battery installation Battery ConnectionsConnecting the Cables Battery Temperature Probe Installation 1 Battery Cable Connection LocationsCounter Electro-Motive Force Cemf Cell Connections DC System GroundingCircuit Breaker Installation Load Protection InstallationGMT Fuse Installation Load Connections Cable Size ConsiderationsCircuit Breaker Protected Load Connections 30 or 60 a GMT Fuse protected Load ConnectionsRJ45 Ethernet Connector Monitoring and Relay Output ConnectionsFront Panel DB9 Connection Major, Minor and Relay 1 Output ConnectionsOutput Relay 2-6 Connections Relay Terminal Relay Alias Output Relay Notes DesignationsRectifier Module Installation External Alarm Input ConnectionsController Module Installation Electrical Installation Battery Visual and Safety InspectionCommissioning Pre-Commissioning InspectionAC Power Up DC Power UpCommissioning Initial Set-upBattery Power Up Rectifier TestLVD Test Circuit Breaker/ Fuse TestFinal Inspection Battery Temperature CompensationOutput Relay Rectifier Management Technical DescriptionSystem Management System Status and Alarm Reporting Load ManagementSystem Current Monitor Circuit BreakersBattery Charging Battery ManagementGMT Fuses Battery Protection Battery EqualizationBattery Temperature Monitoring Battery Functional Test Battery Low Voltage DisconnectCounter Electro-Motive Force Module Connections Controls and Indicators Alarm Outputs Output RelaysController with Display Controller without DisplayExternal Alarm Inputs User Input Network Management Card Local & Remote MonitoringDescription OperationController Card Jumpers Controller with Display J12 J13Operation using Local Display and Keypad Interface 1 Controller with Display设置 / 电池 / 容量 设置 / 系统 / 时/日 均充 / 均充时间 状态 / 系统 /参数 Alarms 均充时间 Operation Using the RS-232 Comm Port Controller without DisplayOperation Using the 10/100 BaseT Ethernet Port 1 Parameter Locations, Descriptions, and Settings ON, OFF Power Modules/Rectifiers Seconds Disable Output Relay LVD Operation System/PreferencesProgramming Output Relays Page Preventive Maintenance System Visual and Safety InspectionEquipment InspectionRectifier Alarm Test TestSystem Voltage Test Rectifier Current Share TestBattery Current Test System Temperature TestBattery Temperature Test Battery Preventive Maintenance Procedure Alarm Summary System LT Alm System Temperature is below Minor Specifications Magnum VS 50 Power SystemAC Input TWF0500H54B RectifierMagnum VS 100 Power System DC OutputMagnum VS 50 Power System Mechanical Magnum VS ControllerEnvironmental Compliance EMCAPC Worldwide Customer Support Limited Product Warranty