GTO RB923 rev installation manual Series

Page 1

￿￿￿￿

SERIES

AUTOMATIC GATE OPERATOR

FOR VEHICULAR SWING GATES

INSTALLATION MANUAL

FOR THE PROFESSIONAL INSTALLER

 

Receiver

 

Control Box with

Post Bracket Assembly

 

Battery

 

120 Volt Indoor

 

Warning Sign

Transformer

Gate Bracket

 

 

 

(surge protector

GTO/PRO 2000

 

not supplied)

 

 

Run 1000' (max.) of low

Power Cable

Closed Position Positive Stop Plate

voltage wire to control

 

 

box from transformer.

 

 

(wire not included)

 

 

PVC conduit (not included) to protect wire from lawn mowers and weed eaters.

WARNING!

READ ALL INSTRUCTIONS CAREFULLY AND COMPLETELY before attempting to install and use this automatic gate operator. This gate operator produces a high level of force. Stay clear of the unit while it is operating and exercise caution at all times.

This product meets and exceeds the requirements of UL 325, the standard which regulates gate operator safety, as established and made effective March 1, 2000, by Underwriters Laboratories Inc.

3121 Hartsfield Road • Tallahassee, Florida, USA 32303 Telephone (850) 575-0176 • FAX (850) 575-8912 • www.gtoinc.com

RB923 rev - 08/01/01© 2000 GTO, Inc.

Image 1
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserInstall Warning Signs Required Safety Precautions for Swing GatesEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPull-to-Open Single Gate gate opens into the property Preparing the GateStep Installing The Post Bracket Assembly Step 1/ nut. Note when tightening Connecting Operator to Post Bracket AssemblyRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSolar Zones and Gate Activity Splice wires togetherEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Set the transmitter DIP Switches Setting the Personal Transmitter CodeRemove the Transmitter Cover Memory Mounting the ReceiverRun the cable through PVC conduit to protect it from damage Step For Pull-to-Open Installations Setting the Closed Position Limit SwitchFor Push-to-Open Installations Step Connecting Additional Safety Devices Safety Edges Compatible Safety DevicesPhotoelectric Beams WHT white used with GRN green Connecting AccessoriesBLU blue used with GRN green ORG orange used with GRN greenStep PTO-1 Push-to-Open InstallationStep PTO-2 Step PTO-4 Step PTO-3Step PTO-5 Step PTO-6Maintenance Maintenance and Troubleshooting GuidePage Limited Two Year Warranty Warranty and Repair ServiceGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListGTO Automatic Gate Lock see Accessory Catalog Installing The Second UnitStep D1 StepD2StepD3 Connecting the Second Operator to the Control BoardStep D-4 Step D-5Step D-7 Setting the Control Board for Dual Gate InstallationsStep D-8 Step D-9Step D-11 RB101 Accessories Available Through Your DealerGTO Nema Box FM317 433IH ACCESS-oriesRB509 Master Pin Lock RB975Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list