GTO RB923 rev Connecting the Second Operator to the Control Board, StepD3, Step D-4, Step D-5

Page 42

StepD3:

Return to page 11, Single Gate Operator Installation, and repeat Step 1 through 15 to install the second operator. This time in Step 15, however, the closed position stop plate on the first gate will contact the leading edge of the second gate.

Connecting the Second Operator to the Control Board

Step D-4:

Turn power switch OFF. Remove the control box cover. Using a steel punch or screwdriver, remove the thin plastic knockout in the second operator connector hole at the bottom of the control box. Work from the inside out to prevent any

possible damage to the control board.

 

 

 

 

 

 

 

 

 

CLOSE

 

 

 

Relief

 

 

Lock Nut

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STATUS

 

 

 

 

 

 

 

Strain

 

 

Hub

 

 

 

 

 

 

 

+

 

 

 

 

 

 

 

 

LEARN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INERTI

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTR.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SENS.

 

 

 

 

 

 

 

 

 

 

 

 

 

1~8VAC~ SO– LA+R

RED BLK ORG BLU

GRN EDGCLS

EDGOPN

RED BLK ORG BLU GRN

ATORCLSEDG OPNEDG

ALARM

GRN ORG BLU WHT

R G

B

 

 

 

 

 

 

Sealing Nut

 

 

 

 

ACCE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SSORY

RCVR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SECOND OPER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIRST OPER

ATOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER IN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lock Nut

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hub

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sealing Nut

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

First Operator Power Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Second Operator Power Cable

 

 

 

 

 

~ ~

 

 

+

 

 

RED

 

 

BLK

ORG

BLU

GRN

CLSEDG

OPNEDG

RED

BLK

ORG

BLU

GRN

CLSEDG

OPNEDG

18VAC SOLAR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER IN FIRST OPERATOR

SECOND OPERATOR

Step D-5:

Insert the strain relief into the knockout hole and finger tighten it in the control box. Insert the stripped end of second operator cable up through bottom of strain relief (if necessary, loosen the strain relief). Pull approximately 4" of wire into the control box and retighten the strain relief on the black sheath of the power cable.

SEQ1

ON

 

 

SEQ2

 

LEARN

 

 

 

 

 

GRN ORG

BLU

WHT

R

B G

 

 

 

ALARM ACCESSORY

 

RCVR

RED

BLACK

ORANGE

BLUE

GREEN

RED

BLACK

ORANGE

BLUE

GREEN

Low Voltage Wire

from AC Transformer

Power Cable

Power Cable

from First Operator

from Second Operator

Step D-6:

Insert the stripped power cable wires into the appropriate terminal on the SECOND OPERATOR terminal block. The green wire should be inserted into the GRN terminal, the blue wire into BLU, the orange wire into ORG, black wire into BLK, and the red wire into the RED terminal.

Tighten the set screws against the stripped end of the wires. A dab of petroleum jelly on each terminal will help prevent corrosion.

39

Image 42
Contents Series Converting Temperature Table of Contents Important Safety Instructions Disconnecting the OperatorBefore Installation II. During InstallationIII. After Installation Entrapment Alarm UL 325 30A.1.1A Secondary Means of Protection Against EntrapmentConsumer/End User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Swing Gates Install Warning SignsEntrapment Protection Moving Gate Can Cause Injury Or Death Technical Specifications GTO/PRO 2000 Series Swing Gate OperatorsParts Hardware not to scaleSingle Gate Operator Parts List Control Box and Electrical ComponentsPreparing the Gate Pull-to-Open Single Gate gate opens into the propertyStep Installing The Post Bracket Assembly Step Rear mount bolt, leave it loose Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Never insert the battery with the terminals to the right BatteryPowering the System Gate LengthSplice wires together Solar Zones and Gate ActivityEstimated Maximum Number of Cycles Per Day Make sure the exposed wires do not touch each other Not touch each otherControl Board Settings DIP SwitchesPotentiometers Setting the Personal Transmitter Code Set the transmitter DIP SwitchesRemove the Transmitter Cover Mounting the Receiver MemoryRun the cable through PVC conduit to protect it from damage Setting the Closed Position Limit Switch Step For Pull-to-Open InstallationsFor Push-to-Open Installations Step Connecting Additional Safety Devices Compatible Safety Devices Safety EdgesPhotoelectric Beams BLU blue used with GRN green Connecting AccessoriesWHT white used with GRN green ORG orange used with GRN greenPush-to-Open Installation Step PTO-1Step PTO-2 Step PTO-5 Step PTO-3Step PTO-4 Step PTO-6Maintenance and Troubleshooting Guide MaintenancePage Warranty and Repair Service Limited Two Year WarrantyGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information Second Unit Parts List GTO/PRO 2200 Dual Gate SystemStep D1 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog StepD2Step D-4 Connecting the Second Operator to the Control BoardStepD3 Step D-5Step D-8 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-9Step D-11 Accessories Available Through Your Dealer RB101GTO Nema Box FM317 RB509 ACCESS-ories433IH Master Pin Lock RB975Access -ories Replacement BatteriesInstallation Check list Installation of this operator conforms to Class