GTO RB923 rev installation manual Important Safety Instructions, Disconnecting the Operator

Page 4

IMPORTANT SAFETY INSTRUCTIONS

Because automatic gate operators produce high levels of force, all system designers, installers, and consumers have an obligation to know the potential hazards associated with improperly designed, installed, or maintained gate operator systems. Keep in mind that the gate operator is just one component of the total gate operating system. Each component must work in unison to provide the consumer with convenience, security, and safety.

This manual contains various safety precautions and warnings for the system designer, installer, and consumer. Because there are many possible applications of the gate operator, the safety precautions and warnings contained in this manual cannot be completely exhaustive in nature. They do, however, provide an overview of the safe design, installation, and use of this product. CAREFULLY READ AND FOLLOW ALL SAFETY PRECAUTIONS, WARNINGS, AND INSTALLA-

TION INSTRUCTIONS TO ENSURE THE SAFE SYSTEM DESIGN, INSTALLATION, AND USE OF THIS PRODUCT.

The precautions and warnings in this manual are identified with this warning symbol. The symbol identifies condi- tions that can result in damage to the operator or its components, serious injury, or death.

Because GTO automatic gate operators are only part of a total gate operating system, it is the responsibility of the designer, installer, and purchaser to ensure that the total system is safe for its intended use.

To Manually Open and Close the Gate, Follow the Procedure Below:

Disconnecting the Operator

1.Turn control box OFF.

2.Remove hairpin clip and clevis pin from front mount.

3.Pull front mount away from gate bracket.

The gate can be opened and closed manually when the gate operator is disconnected.

Gate Bracket

CAUTION: Disconnect the operator ONLY when the control box power switch is OFF and the gate is NOT moving.

Clevis Pin

Push-Pull Tube

Front Mount

Hairpin Clip

1

Image 4
Contents Series Converting Temperature Table of Contents Important Safety Instructions Disconnecting the OperatorBefore Installation II. During InstallationIII. After Installation Entrapment Alarm UL 325 30A.1.1A Secondary Means of Protection Against EntrapmentConsumer/End User No ONE should Cross the Path of the Moving GateInstall Warning Signs Required Safety Precautions for Swing GatesEntrapment Protection Moving Gate Can Cause Injury Or Death Technical Specifications GTO/PRO 2000 Series Swing Gate OperatorsParts Hardware not to scaleSingle Gate Operator Parts List Control Box and Electrical ComponentsPull-to-Open Single Gate gate opens into the property Preparing the GateStep Installing The Post Bracket Assembly Step Connecting Operator to Post Bracket Assembly 1/ nut. Note when tighteningRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Never insert the battery with the terminals to the right BatteryPowering the System Gate LengthSolar Zones and Gate Activity Splice wires togetherEstimated Maximum Number of Cycles Per Day Make sure the exposed wires do not touch each other Not touch each otherControl Board Settings DIP SwitchesPotentiometers Set the transmitter DIP Switches Setting the Personal Transmitter CodeRemove the Transmitter Cover Memory Mounting the ReceiverRun the cable through PVC conduit to protect it from damage Step For Pull-to-Open Installations Setting the Closed Position Limit SwitchFor Push-to-Open Installations Step Connecting Additional Safety Devices Safety Edges Compatible Safety DevicesPhotoelectric Beams Connecting Accessories WHT white used with GRN greenBLU blue used with GRN green ORG orange used with GRN greenStep PTO-1 Push-to-Open InstallationStep PTO-2 Step PTO-3 Step PTO-4Step PTO-5 Step PTO-6Maintenance and Troubleshooting Guide MaintenancePage Limited Two Year Warranty Warranty and Repair ServiceGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information Second Unit Parts List GTO/PRO 2200 Dual Gate SystemInstalling The Second Unit GTO Automatic Gate Lock see Accessory CatalogStep D1 StepD2Connecting the Second Operator to the Control Board StepD3Step D-4 Step D-5Setting the Control Board for Dual Gate Installations Step D-7Step D-8 Step D-9Step D-11 RB101 Accessories Available Through Your DealerGTO Nema Box FM317 ACCESS-ories 433IHRB509 Master Pin Lock RB975Access -ories Replacement BatteriesInstallation Check list Installation of this operator conforms to Class