GTO RB923 rev Single Gate Operator Parts List, Control Box and Electrical Components

Page 13

Single Gate Operator Parts List

Control Box and Electrical Components

! WARNING

Moving Gate Can Cause

Injury Or Death

￿￿￿￿￿￿￿1. KEEP CLEAR! Gate may￿￿￿￿￿move at any time. ￿￿￿

2. Do not allow children to operate gate or play in gate area.

3. This gate is for vehicles only. Pedestrians must use a separate entrance.

OTHER MATERIALS YOU MAY NEED BEFORE YOU START THE INSTALLATION:

Depending on the type of gate and fence post, you may need some additional materials/hardware. Some of these items can be found in the GTO/PRO Accessory Catalog.

All gates will need a stop post in the open position. This post is not provided. See page 16, Installation of Open and Closed Position Stops for more information.

Low voltage wire may be needed. Length depends upon the distance between the transformer power supply and the control box. See page 19, Powering the System and the Accessory Catalog for wire and solar charging panels.

If the gate is more than 1000' away from an AC power source you will need to use at least one GTO Solar Panel to trickle charge the battery. See the Accessory Catalog.

The diameter of the fence post should be at least 8" (round) or 6" (square) in order to mount the post bracket (see page 12). An optional 4” bracket can be used with 4” post, and mounting bracket adapters must be used with 4" and 6" round posts. (See Accessory Catalog).

Depending upon the diameter of the fence post, you may need longer carriage bolts than those provided. Bolts should be at least 1" longer than the diameter of the fence post (see page 12).

If using thin wall tube or panel gates, see page 14 for recommended reinforcement materials.

A horizontal or vertical cross member or mounting plate may be needed to mount the operator to the gate. See page 11.

10

Image 13
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserInstall Warning Signs Required Safety Precautions for Swing GatesEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPull-to-Open Single Gate gate opens into the property Preparing the GateStep Installing The Post Bracket Assembly Step 1/ nut. Note when tightening Connecting Operator to Post Bracket AssemblyRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSolar Zones and Gate Activity Splice wires togetherEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Set the transmitter DIP Switches Setting the Personal Transmitter CodeRemove the Transmitter Cover Memory Mounting the ReceiverRun the cable through PVC conduit to protect it from damage Step For Pull-to-Open Installations Setting the Closed Position Limit SwitchFor Push-to-Open Installations Step Connecting Additional Safety Devices Safety Edges Compatible Safety DevicesPhotoelectric Beams WHT white used with GRN green Connecting AccessoriesBLU blue used with GRN green ORG orange used with GRN greenStep PTO-1 Push-to-Open InstallationStep PTO-2 Step PTO-4 Step PTO-3Step PTO-5 Step PTO-6Maintenance Maintenance and Troubleshooting GuidePage Limited Two Year Warranty Warranty and Repair ServiceGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListGTO Automatic Gate Lock see Accessory Catalog Installing The Second UnitStep D1 StepD2StepD3 Connecting the Second Operator to the Control BoardStep D-4 Step D-5Step D-7 Setting the Control Board for Dual Gate InstallationsStep D-8 Step D-9Step D-11 RB101 Accessories Available Through Your DealerGTO Nema Box FM317 433IH ACCESS-oriesRB509 Master Pin Lock RB975Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list